Security+ Cheat Sheet
Quick-reference summary of the key facts for the SY0-701 exam.
Exam at a glance
- Exam code: SY0-701 — up to 90 questions, 90 minutes, passing score 750 on a 100–900 scale
- Fee: $439 USD (raised from $425 on 1 June 2026; $404 was an older price)
- Question types: multiple choice, multiple response, and performance-based questions (PBQs)
- Valid: 3 years; renew with 50 CEUs + $150 CE fee, or by passing the newest exam, or by earning CySA+, PenTest+, or SecurityX
- Retakes: no wait before a 2nd attempt; 14 calendar days before a 3rd or later attempt; full fee each time
- Versions: SY0-801 launched 17 Nov 2026; SY0-701 retires 11 Jun 2027 (English) / 13 Aug 2027 (other languages). Certification is valid 3 years whichever version you take.
Domain weights
- 1.0 General Security Concepts — 12%
- 2.0 Threats, Vulnerabilities, and Mitigations — 22%
- 3.0 Security Architecture — 18%
- 4.0 Security Operations — 28% (largest — study it most)
- 5.0 Security Program Management and Oversight — 20%
Controls: categories vs types
- Categories (how implemented): technical, managerial, operational, physical
- Types (what they do): preventive, deterrent, detective, corrective, compensating, directive
- Firewall = technical + preventive. Warning sign = deterrent. IDS = detective. Backup restore = corrective. Isolating an unpatchable system = compensating.
CIA triad & AAA
- CIA: confidentiality (only authorized access), integrity (data unaltered), availability (accessible when needed)
- AAA: authentication (who are you?), authorization (what can you do?), accounting (what did you do?)
- Non-repudiation: cannot deny an action — achieved with digital signatures and logs
Zero trust
- Never trust, always verify — every request checked, even from inside the network
- Control plane: policy engine (decides), policy administrator (implements), policy enforcement point (allows/blocks)
Cryptography
- Symmetric (one shared key, fast, bulk data): AES-128/192/256. DES and 3DES are deprecated.
- Asymmetric (key pair, slow, key exchange/signatures): RSA-2048/4096, ECC. Diffie-Hellman = key exchange; ephemeral (DHE/ECDHE) = forward secrecy.
- Hashing (one-way, integrity): SHA-256/SHA-512. MD5 and SHA-1 are broken. Salt defeats rainbow tables. bcrypt/PBKDF2 = key stretching.
- Encrypt: public key encrypts, private key decrypts. Sign: private key signs, public key verifies.
- PKI: CA issues certificates; CSR requests one. Revocation: CRL (list) or OCSP (real-time check). Wildcard = domain + subdomains. Self-signed = not trusted.
- TPM = chip storing keys; HSM = dedicated key device; tokenization = replace data with a meaningless token; data masking = hide part of the data.
Threats & attacks
- Actors: nation-state (espionage, APT), organized crime (money, ransomware), hacktivist (publicity), insider (legitimate access), unskilled attacker (uses others' tools)
- Messages: phishing (email), spear phishing (targeted), whaling (executives), smishing (SMS), vishing (voice), BEC (impersonate executive, wire money)
- Social engineering: pretexting (fake scenario), baiting (tempting lure), quid pro quo (service for access), tailgating (follow through door), shoulder surfing, watering hole, typosquatting
- Malware: virus (needs host file + user action), worm (spreads alone), Trojan (disguised, no self-replication), ransomware (encrypts + demands payment), spyware/keylogger, rootkit (hides deep), backdoor, logic bomb, fileless (runs in memory)
- Password attacks: brute force (every combination), dictionary (word list), spraying (few passwords, many accounts), credential stuffing (stolen pairs reused)
- Other: on-path (intercept traffic), DNS poisoning (corrupt cache), amplification (small request, huge response at victim), cryptojacking (mine crypto on victim's CPU), impossible travel (logins from two far-apart places)
Vulnerabilities
- SQL injection: database commands in input — fix with parameterized queries
- XSS: stored (saved on server, hits all visitors) vs reflected (crafted link, one victim). CSRF: tricks a logged-in browser into an unwanted action.
- Zero-day: flaw with no patch yet. VM escape: break out of a VM to the host. IDOR: change an ID in a URL to access another user's data.
- Cloud: misconfiguration is the most common vulnerability (public bucket, open security group)
Architecture & data
- Cloud: IaaS (you manage OS), PaaS (provider manages OS, you manage app), SaaS (provider manages app). Public, private, community, hybrid, multicloud.
- Containers share the host kernel; VMs run a full guest OS. IoT: isolate, change defaults, inventory. ICS/SCADA: availability first, isolate from corporate network.
- DMZ = public servers. Jump server = only admin path into a zone. VLAN = logical separation. WAF = blocks web attacks. Load balancer = distributes traffic.
- Protocols: SSH (not Telnet), SFTP (not FTP), HTTPS (not HTTP), LDAPS (not LDAP), SNMPv3 (not v1/v2c). IPSec tunnel mode = whole packet (site-to-site); transport mode = payload only.
- RPO = max data loss (time). RTO = max downtime. Backups: full (fastest restore), incremental (changes since last backup of any kind), differential (changes since last full).
- RAID: 0 = striping, no redundancy; 1 = mirroring; 5 = parity, survives 1 disk failure; 6 = double parity, survives 2; 10 = mirror + stripe. RAID is not a backup.
- Recovery sites: hot (immediate, most expensive), warm (needs data restore), cold (empty space, slowest).
- DLP blocks sensitive data leaving the organization. Data states: at rest (disk encryption), in transit (TLS/VPN), in use (masking, secure enclave).
Operations
- Wireless: WPA3 (best) > WPA2 > WPA > WEP (broken). Enterprise = 802.1X + RADIUS, individual credentials.
- CVSS: Critical 9.0–10.0, High 7.0–8.9, Medium 4.0–6.9, Low 0.1–3.9
- IDS detects and alerts only. IPS detects and blocks. SIEM collects and correlates logs. Credentialed scans log in; non-credentialed probe from outside.
- Vulnerability lifecycle: identify → analyze → remediate → validate → report. False positive = reported but not real; false negative = real but missed.
- Email: SPF (authorized sending servers), DKIM (signs messages), DMARC (what to do when checks fail). NAC checks device health before network access. EDR monitors endpoints, can isolate them.
- Access control: RBAC (job roles), MAC (classification labels, user cannot change), DAC (owner decides), ABAC (attributes), rule-based (rules like time/location)
- MFA factors: something you know, something you have, something you are — must be from different categories. SSO via federation: SAML (enterprise SSO), OAuth (grant app limited access), OpenID Connect (identity on OAuth). Kerberos = Windows domain authentication.
- Incident response: preparation → detection → analysis → containment → eradication → recovery → lessons learned. Containment stops spread; eradication removes the cause; recovery restores service.
- Forensics: image the drive, work from the copy, maintain chain of custody. Order of volatility: memory first, then disk, then remote logs.
- Automation = one task without humans. Orchestration = many tools coordinated in one workflow (SOAR).
Governance & risk
- Documents: policy (what is required), standard (specific mandatory details), procedure (step-by-step), guideline (recommendation). AUP = acceptable use policy.
- Formulas: SLE = Asset Value × Exposure Factor. ALE = SLE × Annualized Rate of Occurrence.
- Risk treatments: mitigate (reduce with controls), accept (live with it, documented), transfer (insurance, outsourcing), avoid (stop the activity). Residual risk = what remains after controls.
- Agreements: SLA (uptime/performance), NDA (confidentiality), MOU (non-binding intent), BPA (partnership), ISA (network interconnection security)
- Regulations: GDPR (EU personal data, breach notification within 72 hours), HIPAA (US health data), PCI DSS (credit cards), SOX (financial reporting), FERPA (student records), FISMA (US federal agencies)
- Frameworks: NIST CSF (Identify, Protect, Detect, Respond, Recover), ISO 27001, CIS Controls
- Testing: black-box (no info), white-box (full info), gray-box (partial). Red team attacks, blue team defends, purple team combines both.
Advertisement