A+ Core 1 Cheat Sheet
Quick-reference summary of the key facts for the 220-1201 exam.
This cheat sheet collects the facts worth memorizing in the last few days before the 220-1201 exam. It is a revision aid, not a substitute for the study guides: if any line here is unfamiliar, go back to the guide that explains it. The highest-value items are the port numbers, the RAID levels, and the troubleshooting symptom tables.
Ports to know cold
20–21 FTP · 22 SSH · 23 Telnet · 25 SMTP (sends mail) · 53 DNS (UDP) · 67/68 DHCP · 80 HTTP · 110 POP3 · 143 IMAP · 389 LDAP · 443 HTTPS · 445 SMB · 137–139 NetBIOS · 3389 RDP. TCP is connection-oriented and reliable; UDP is connectionless and fast. DNS uses UDP 53 for lookups, TCP for large replies.
Wi-Fi bands and standards
2.4 GHz: longest range, most crowded, only channels 1, 6, 11 non-overlapping. 5 GHz: faster, more channels, shorter range. 6 GHz: newest, least congestion, shortest range (Wi-Fi 6E/7). 802.11n = Wi-Fi 4 (2.4+5 GHz, MIMO). 802.11ac = Wi-Fi 5 (5 GHz only). 802.11ax = Wi-Fi 6/6E (adds 6 GHz in 6E). 802.11be = Wi-Fi 7.
IP addressing quick reference
Private IPv4: 10.0.0.0/8, 172.16.0.0/12, 192.168.0.0/16. APIPA: 169.254.0.0/16 — means DHCP failed. Loopback: 127.0.0.1. DNS records: A = IPv4, AAAA = IPv6, CNAME = alias, MX = mail server, TXT = text (SPF/DKIM/DMARC). DHCP: scope = range, lease = temporary assignment, reservation = fixed address per MAC, exclusion = addresses removed from the pool.
RAM and storage
DIMM = desktop, SODIMM = laptop. DDR generations are not interchangeable (different keying). ECC corrects single-bit errors (servers); non-ECC is standard for desktops. Dual-channel needs matched modules in paired slots. RAID 0 = stripe, no redundancy. RAID 1 = mirror, survives 1 failure. RAID 5 = stripe + parity, min 3 drives, survives 1 failure. RAID 6 = double parity, min 4 drives, survives 2 failures. RAID 10 = mirror + stripe, min 4 drives. NVMe over PCIe is far faster than SATA (600 MB/s cap).
Cables
Cat5e = 1 Gbps, Cat6 = 10 Gbps (short runs), Cat6a = 10 Gbps (100 m). T568A/T568B are the wiring standards. Single-mode fiber = long distance (laser). Multimode fiber = short runs (LED). Fiber connectors: ST, SC, LC. HDMI and DisplayPort carry video + audio; DVI is video only; VGA is analogue. SATA = internal drives, eSATA = external. USB-C carries data, video, and power.
Power and motherboards
PSU outputs: 12V, 5V, 3.3V. Input: 110–120 VAC (North America) vs 220–240 VAC (most of the world). Main connector: 20+4 pin. 80 PLUS rates efficiency. Form factors: ATX, microATX, ITX. CPU sockets are vendor- and generation-specific. TPM stores encryption keys; Secure Boot allows only signed OSs to boot. x86/x64 = desktops/servers; ARM = mobile and power-efficient devices.
Printers
Laser: fast, low cost per page, toner + fuser; maintenance kit at high page counts. Inkjet: cheap, good photos, printheads clog. Thermal: receipts and labels, special paper, no ink. Impact (dot-matrix): only type for multipart forms. PCL = general office; PostScript = graphics/publishing. Garbled print = wrong driver. Faded laser output = low toner or failing fuser. Lines down the page = scratched drum or damaged fuser roller. Echo/ghost image = fuser not heating or damaged drum.
Virtualization and cloud
Type 1 hypervisor = bare-metal (runs on hardware). Type 2 = hosted (runs inside an OS). VM = full guest OS; container = shares host kernel. VDI = desktops as VMs on central servers. IaaS = you manage OS and apps. PaaS = you deploy code only. SaaS = you just use the app. Public = shared provider cloud; private = dedicated to one org; hybrid = both; community = shared by orgs with common interests. Ingress (in) usually free; egress (out) usually charged. Elasticity = auto-scaling with demand.
Troubleshooting symptoms
POST beeps = hardware fault (usually RAM/video). No power at all = PSU/cable/outlet. Clock resets = dead CMOS battery. Clicking/grinding drive = mechanical failure, back up now. S.M.A.R.T. failure = drive predicting failure, replace it. Degraded RAID = replace the failed drive and rebuild. "Limited connectivity" = no valid IP, usually DHCP failure (APIPA). Slow link at 100 Mbps on a gigabit NIC = damaged cable or port. Jitter = variable delay, hurts VoIP. Port flapping = faulty cable or port. Microwave killing Wi-Fi = 2.4 GHz interference. Frozen print queue = clear queue, restart spooler. Paper misfeed = worn separation pads or humid paper.