Managing & Deploying Azure Resources

AZ-900 AZ-900 · Describe Azure management and governance

By Abu Anns · Last updated 20 November 2026Exam version: AZ-900 (skills measured as of July 20, 2026)

Four ways to manage Azure

Azure can be managed through four main tools, and the exam expects you to describe each and know when to use it. They all do the same underlying job — creating, configuring, and managing resources — but they suit different people and different tasks.

The Azure portal is the web-based graphical interface at portal.azure.com: point, click, and manage everything from dashboards. It is the best tool for learning Azure, for one-off tasks, and for visualising an environment. Every other tool can do things the portal can too, but the portal is where most people start, and it is the only tool that needs no installation and no scripting knowledge.

Azure Cloud Shell is a browser-based shell built into the portal: a command line in the browser, with a choice of Bash or PowerShell, and with the Azure CLI and Azure PowerShell preinstalled. It needs no local setup, and it stores your files persistently in an Azure storage account (Cloud Shell creates one on first use). Cloud Shell is the answer when a question describes managing Azure from a command line without installing anything locally.

The Azure CLI is a cross-platform command-line tool (the az commands) installed on your own machine, for Windows, macOS, and Linux. It is scriptable, automation-friendly, and the standard choice for repeatable command-line work and for CI/CD pipelines. Azure PowerShell is the PowerShell module (the Az cmdlets) for managing Azure from PowerShell — the natural choice for administrators who already work in PowerShell, especially in Windows-heavy environments. The exam distinguishes them simply: CLI is cross-platform command line, PowerShell is the PowerShell module. A question that says "the administrator works in PowerShell and wants cmdlets" points to Azure PowerShell; one that says "a cross-platform command-line tool" points to the CLI.

Azure Arc: managing beyond Azure

Not everything an organisation runs lives in Azure. Azure Arc extends Azure management to resources outside Azure — servers on-premises or in other clouds, Kubernetes clusters anywhere, and even data services. Once a server is Arc-enabled, it appears in the Azure portal, can be governed by Azure Policy, can be monitored, and can be managed with the same tools as native Azure resources. Arc is the exam's answer for hybrid and multi-cloud management: "manage our on-premises servers from the Azure portal" is an Arc scenario. It does not move the servers to Azure — it brings Azure management to where they already are.

Infrastructure as code (IaC)

Infrastructure as code (IaC) means defining infrastructure in machine-readable files instead of configuring it by clicking through a portal. The file describes the desired state — "a resource group, a virtual network, two virtual machines" — and a tool creates it. The benefits are the exam's focus: consistency (the same file produces the same environment every time), repeatability (deploy the same infrastructure to dev, test, and production), version control (infrastructure changes are tracked like code, with history and rollback), and automation (deployments become part of a pipeline). IaC turns infrastructure from a manual craft into a repeatable process, and it is how organisations manage environments too large to click through by hand.

IaC comes in two styles. Declarative IaC describes the desired end state and lets the tool work out the steps — ARM templates and Bicep are declarative ("I want this to exist"). Imperative IaC lists the steps in order — scripts that run command after command ("do this, then this"). The exam tests the distinction lightly: ARM templates are the declarative example.

Azure Resource Manager and ARM templates

Azure Resource Manager (ARM) is the deployment and management layer for Azure: every request to create, update, or delete a resource goes through ARM, whether it comes from the portal, the CLI, PowerShell, or a template. ARM handles authentication, applies policies and locks, and tracks resources. You never "use" ARM directly as a tool — it is the layer underneath all the tools.

ARM templates are JSON files that declare the infrastructure to deploy, and ARM reads them and creates the resources. A template is declarative (it describes the desired state), idempotent (deploying the same template twice produces the same result — the second run changes nothing), and modular (templates can link to other templates and use parameters and variables). Before deploying, you can run a what-if operation to preview what a template would change, without changing anything — the exam likes this detail for questions about safely previewing a deployment. Bicep is a simpler language that compiles to ARM templates — easier to read and write than JSON — and is worth knowing as the modern companion to ARM templates, although the objectives name ARM templates specifically.

Worked example: deploying the same environment three times

A team needs identical dev, test, and production environments. Clicking through the portal three times would produce three slightly different environments and take a day. The IaC approach: write one ARM template (or Bicep file) describing the resource group, network, app service, and database, parameterised by environment name, and deploy it three times with different parameters. Each deployment is identical, takes minutes, is recorded in version control, and can be previewed with what-if before it runs. When the production environment needs a change, the team edits the template, reviews the change, and redeploys — the environment is never modified by hand, so it never drifts. That is the whole IaC story: define once, deploy anywhere, change through code.

Bicep and the Azure mobile app

Two more tools round out the picture. Bicep is Microsoft's domain-specific language for deploying Azure resources: it uses a simpler, cleaner syntax than ARM templates' JSON, and it compiles down to ARM templates before deployment — so everything Bicep does, ARM does underneath. Teams choose Bicep when they find JSON templates hard to read and maintain; the exam mentions ARM templates specifically, but knowing that Bicep is the friendlier front end to the same engine is useful context. The Azure mobile app lets administrators monitor resources, check Service Health, and respond to alerts from a phone — handy for keeping an eye on an environment away from a desk, but a companion to the portal rather than a replacement for it. Neither tool is a headline exam topic; both are worth a passing mention so they do not surprise you if they appear as distractors.

Advertisement

Exam traps to watch for

Practice questions

Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.

Q1.An administrator needs to manage Azure from a command line but cannot install any software on their work laptop. Which tool should they use?

Report an error

Q2.A company runs servers on-premises and in another cloud. It wants to manage all of them — including applying Azure Policy — from the Azure portal, without moving them. Which service enables this?

Report an error

Q3.A team wants to define its infrastructure in a file so that the same environment can be deployed identically to development, testing, and production, with all changes tracked in version control. Which approach is this?

Report an error

Q4.What is Azure Resource Manager (ARM)?

Report an error

Q5.A team is about to deploy an ARM template to production and wants to preview exactly what will change, without actually changing anything. What should it run?

Report an error

Q6.Which statement about ARM templates is correct?

Report an error

Q7.An administrator who works in PowerShell every day wants to manage Azure with cmdlets in their existing scripts. Which tool should they use?

Report an error

Q8.A new Azure user wants to explore the platform visually, create their first resources, and see dashboards of their environment. Which tool is the best starting point?

Report an error