Cloud · Cybersecurity · IT Support · Networking · Project Management

Free Certification Exam Prep

Study guides, practice questions, and mock tests for the certifications that move careers — free, with no signup and no paywall.

10 certifications live144 study guides1425 practice questions100% free

Advertisement

Certifications

AWS SAA (SAA-C03)

AWS Certified Solutions Architect – Associate — study guides, practice questions, and a timed mock test.

Live 14 guides · 111 questions

Security+ (SY0-801)

CompTIA Security+ — study guides, practice questions, and a timed mock test.

Live 16 guides · 139 questions

PMP (PMP)

Project Management Professional (PMP) — study guides, practice questions, and a timed mock test.

Live 14 guides · 110 questions

AZ-900 (AZ-900)

Microsoft Azure Fundamentals — study guides, practice questions, and a timed mock test.

Live 14 guides · 112 questions

AZ-305 (AZ-305)

Microsoft Azure Solutions Architect Expert — study guides, practice questions, and a timed mock test.

Live 14 guides · 126 questions

CCNA (200-301)

Cisco Certified Network Associate — study guides, practice questions, and a timed mock test.

Live 14 guides · 130 questions

PSM I (PSM I)

Professional Scrum Master I — study guides, practice questions, and a timed mock test.

Live 14 guides · 126 questions

Google ACE (ACE)

Google Cloud Certified – Associate Cloud Engineer — study guides, practice questions, and a timed mock test.

Live 14 guides · 112 questions

CISSP (CISSP)

Certified Information Systems Security Professional — study guides, practice questions, and a timed mock test.

Live 14 guides · 112 questions

A+ Core 1 (220-1201)

CompTIA A+ Core 1 — study guides, practice questions, and a timed mock test.

Live 8 guides · 64 questions

A+ Core 2 (220-1202)

CompTIA A+ Core 2 — study guides, practice questions, and a timed mock test.

Live 8 guides · 64 questions

Study guides

IAM & Access Control

AWS SAA · Design Secure Architectures

8 practice questions

VPC Networking

AWS SAA · Design Secure Architectures

8 practice questions

EC2 & Compute

AWS SAA · Design High-Performing Architectures

8 practice questions

S3 Storage

AWS SAA · Design Resilient Architectures

8 practice questions

EBS & EFS

AWS SAA · Design High-Performing Architectures

8 practice questions

RDS, Aurora & DynamoDB

AWS SAA · Design High-Performing Architectures

8 practice questions

Lambda & Serverless

AWS SAA · Design High-Performing Architectures

8 practice questions

CloudFront & Edge

AWS SAA · Design High-Performing Architectures

8 practice questions

Route 53 & DNS

AWS SAA · Design Resilient Architectures

8 practice questions

Load Balancing & Auto Scaling

AWS SAA · Design Resilient Architectures

8 practice questions

CloudWatch & CloudTrail

AWS SAA · Design Secure Architectures

8 practice questions

Cost Optimization

AWS SAA · Design Cost-Optimized Architectures

8 practice questions

Migration & Hybrid

AWS SAA · Design Resilient Architectures

7 practice questions

Data Protection & Resilience

AWS SAA · Design Secure Architectures

8 practice questions

Security Controls, the CIA Triad & Zero Trust

Security+ · General Security Concepts

8 practice questions

Cryptography & PKI

Security+ · General Security Concepts

8 practice questions

Threat Actors & Attack Vectors

Security+ · Threats, Vulnerabilities, and Attacks

10 practice questions

Vulnerabilities: Applications, Web, Cloud & Supply Chain

Security+ · Threats, Vulnerabilities, and Attacks

9 practice questions

Indicators of Malicious Activity

Security+ · Threats, Vulnerabilities, and Attacks

8 practice questions

Threat & Vulnerability Characteristics

Security+ · Threats, Vulnerabilities, and Attacks

8 practice questions

AI Threats & Vulnerabilities

Security+ · Threats, Vulnerabilities, and Attacks

8 practice questions

Architecture Models: Cloud, Virtualization, IoT & ICS

Security+ · Security Architecture

8 practice questions

Securing Enterprise Infrastructure

Security+ · Security Architecture

8 practice questions

Data Protection, Resilience & Recovery

Security+ · Security Architecture

8 practice questions

Hardening Computing Resources & Asset Management

Security+ · Security Operations

12 practice questions

Vulnerability Management, Alerting & Monitoring

Security+ · Security Operations

8 practice questions

Enterprise Security Tools & Identity and Access Management

Security+ · Security Operations

8 practice questions

Automation, Incident Response & Investigations

Security+ · Security Operations

12 practice questions

Security Governance & Risk Management

Security+ · Security Program Management and Oversight

8 practice questions

Third-Party Risk, Compliance, Audits & Security Awareness

Security+ · Security Program Management and Oversight

8 practice questions

Leading the Project Team

PMP · People

8 practice questions

Managing Conflict

PMP · People

8 practice questions

Engaging Stakeholders and Managing Expectations

PMP · People

8 practice questions

Communication and Knowledge Transfer

PMP · People

8 practice questions

Integrated Planning and Delivery

PMP · Process

8 practice questions

Scope and Schedule Management

PMP · Process

8 practice questions

Cost, Finance and Earned Value

PMP · Process

7 practice questions

Quality Management

PMP · Process

8 practice questions

Resources and Procurement

PMP · Process

8 practice questions

Value-Based Delivery, Status and Closure

PMP · Process

8 practice questions

Project Governance and Compliance

PMP · Business Environment

8 practice questions

Risk Management

PMP · Business Environment

7 practice questions

Change Control, Issues and Impediments

PMP · Business Environment

8 practice questions

Business Value, Organizational Change and the External Environment

PMP · Business Environment

8 practice questions

Cloud Computing & Cloud Models

AZ-900 · Describe cloud concepts

8 practice questions

The Shared Responsibility Model & Cloud Pricing

AZ-900 · Describe cloud concepts

8 practice questions

Benefits of Cloud Services

AZ-900 · Describe cloud concepts

8 practice questions

IaaS, PaaS & SaaS

AZ-900 · Describe cloud concepts

8 practice questions

Azure Regions, Zones & the Resource Hierarchy

AZ-900 · Describe Azure architecture and services

8 practice questions

Azure Compute Services

AZ-900 · Describe Azure architecture and services

8 practice questions

Azure Networking Services

AZ-900 · Describe Azure architecture and services

8 practice questions

Azure Storage Services

AZ-900 · Describe Azure architecture and services

8 practice questions

Identity, Access & RBAC in Azure

AZ-900 · Describe Azure architecture and services

8 practice questions

Zero Trust, Defense in Depth & Defender for Cloud

AZ-900 · Describe Azure architecture and services

8 practice questions

Cost Management in Azure

AZ-900 · Describe Azure management and governance

8 practice questions

Governance & Compliance: Policy, Locks & Purview

AZ-900 · Describe Azure management and governance

8 practice questions

Managing & Deploying Azure Resources

AZ-900 · Describe Azure management and governance

8 practice questions

Monitoring Azure: Advisor, Service Health & Monitor

AZ-900 · Describe Azure management and governance

8 practice questions

Identity and Authentication Design

AZ-305 · Design identity, governance, and monitoring solutions

9 practice questions

Authorisation, RBAC and Secrets Design

AZ-305 · Design identity, governance, and monitoring solutions

9 practice questions

Governance, Management Groups and Compliance

AZ-305 · Design identity, governance, and monitoring solutions

9 practice questions

Logging and Monitoring Design

AZ-305 · Design identity, governance, and monitoring solutions

9 practice questions

Relational Data Storage Design

AZ-305 · Design data storage solutions

9 practice questions

Semi-Structured and Unstructured Data Storage

AZ-305 · Design data storage solutions

9 practice questions

Data Integration and Analytics Design

AZ-305 · Design data storage solutions

9 practice questions

Backup and Disaster Recovery Design

AZ-305 · Design business continuity solutions

9 practice questions

High Availability Design

AZ-305 · Design business continuity solutions

9 practice questions

Compute Solutions Design

AZ-305 · Design infrastructure solutions

9 practice questions

Application Architecture Design

AZ-305 · Design infrastructure solutions

9 practice questions

Migration Design and the Cloud Adoption Framework

AZ-305 · Design infrastructure solutions

9 practice questions

Network Connectivity Design

AZ-305 · Design infrastructure solutions

9 practice questions

Network Security, Performance and Load Balancing

AZ-305 · Design infrastructure solutions

9 practice questions

Network Devices, Topologies & Virtualization

CCNA · Network Fundamentals

9 practice questions

Switching Concepts, Cabling & Interface Issues

CCNA · Network Fundamentals

9 practice questions

TCP vs UDP & Verifying Client IP Settings

CCNA · Network Fundamentals

8 practice questions

IPv4 Addressing & Subnetting

CCNA · Network Fundamentals

10 practice questions

IPv6 Addressing & Address Types

CCNA · Network Fundamentals

9 practice questions

VLANs, Trunking & InterVLAN Routing

CCNA · Network Access

9 practice questions

EtherChannel, Spanning Tree & Discovery Protocols

CCNA · Network Access

9 practice questions

Wireless Networking & WLAN Architecture

CCNA · Network Access

9 practice questions

Routing Tables & Forwarding Decisions

CCNA · IP Connectivity

9 practice questions

Static Routing, OSPFv2 & First Hop Redundancy

CCNA · IP Connectivity

10 practice questions

IP Services: NAT, DHCP, DNS, NTP, SNMP, Syslog & QoS

CCNA · IP Services

10 practice questions

Security Concepts, Device Hardening, VPNs & ACLs

CCNA · Security Fundamentals

10 practice questions

Layer 2 Security & Wireless Security

CCNA · Security Fundamentals

9 practice questions

Automation & Programmability

CCNA · Automation and Programmability

10 practice questions

Empiricism & the Scrum Values

PSM I · Scrum Theory & Values

9 practice questions

The Scrum Team

PSM I · Scrum Team & Accountabilities

9 practice questions

The Scrum Master

PSM I · Scrum Team & Accountabilities

9 practice questions

The Product Owner

PSM I · Scrum Team & Accountabilities

9 practice questions

The Developers

PSM I · Scrum Team & Accountabilities

9 practice questions

The Sprint

PSM I · Scrum Events

9 practice questions

Sprint Planning

PSM I · Scrum Events

9 practice questions

Daily Scrum

PSM I · Scrum Events

9 practice questions

Sprint Review

PSM I · Scrum Events

9 practice questions

Sprint Retrospective

PSM I · Scrum Events

9 practice questions

Product Backlog & Product Goal

PSM I · Artifacts & Commitments

9 practice questions

Sprint Backlog & Sprint Goal

PSM I · Artifacts & Commitments

9 practice questions

Increment & Definition of Done

PSM I · Artifacts & Commitments

9 practice questions

Applying Scrum in Real Teams

PSM I · Applying Scrum in Practice

9 practice questions

Projects & the Resource Hierarchy

Google ACE · Setting up a cloud solution environment

8 practice questions

Billing, Budgets & Quotas

Google ACE · Setting up a cloud solution environment

8 practice questions

Choosing Compute: GCE, GKE, Cloud Run, Cloud Functions

Google ACE · Planning and implementing a cloud solution

8 practice questions

Choosing Storage & Databases

Google ACE · Planning and implementing a cloud solution

8 practice questions

Planning Network Resources

Google ACE · Planning and implementing a cloud solution

8 practice questions

Deploying Compute Engine

Google ACE · Planning and implementing a cloud solution

8 practice questions

Deploying Google Kubernetes Engine

Google ACE · Planning and implementing a cloud solution

8 practice questions

Deploying Cloud Run & Cloud Functions

Google ACE · Planning and implementing a cloud solution

8 practice questions

Deploying Data Solutions

Google ACE · Planning and implementing a cloud solution

8 practice questions

Deploying Networking & Infrastructure as Code

Google ACE · Planning and implementing a cloud solution

8 practice questions

Managing Compute: GCE, GKE & Cloud Run

Google ACE · Ensuring the successful operation of a cloud solution

8 practice questions

Managing Storage, Databases & Networking

Google ACE · Ensuring the successful operation of a cloud solution

8 practice questions

Monitoring & Logging

Google ACE · Ensuring the successful operation of a cloud solution

8 practice questions

IAM & Service Accounts

Google ACE · Configuring access and security

8 practice questions

Security Governance, Ethics & Compliance

CISSP · Security and Risk Management

8 practice questions

Risk Management, Threat Modelling & Business Continuity

CISSP · Security and Risk Management

8 practice questions

Asset Security & Data Lifecycle

CISSP · Asset Security

8 practice questions

Security Models & Secure Architecture

CISSP · Security Architecture and Engineering

8 practice questions

Cryptography & PKI

CISSP · Security Architecture and Engineering

8 practice questions

Physical & Environmental Security

CISSP · Security Architecture and Engineering

8 practice questions

Secure Network Architecture & Components

CISSP · Communication and Network Security

8 practice questions

Secure Communication Channels & Protocols

CISSP · Communication and Network Security

8 practice questions

Access Control Models & Administration

CISSP · Identity and Access Management (IAM)

8 practice questions

Identity Management, Federation & Kerberos

CISSP · Identity and Access Management (IAM)

8 practice questions

Security Assessment, Testing & Auditing

CISSP · Security Assessment and Testing

8 practice questions

Security Operations, Incident Response & Investigations

CISSP · Security Operations

8 practice questions

Business Continuity & Disaster Recovery

CISSP · Security Operations

8 practice questions

Software Development Security

CISSP · Software Development Security

8 practice questions

Mobile Devices: Hardware, Accessories & Connectivity

A+ Core 1 · Mobile Devices

8 practice questions

Ports, Protocols & Wireless Networking

A+ Core 1 · Networking

8 practice questions

Network Services, Hardware & SOHO Setup

A+ Core 1 · Networking

8 practice questions

Hardware: Displays, Cables, RAM, Storage, Boards & Power

A+ Core 1 · Hardware

8 practice questions

Printers & Multifunction Devices

A+ Core 1 · Hardware

8 practice questions

Virtualization & Cloud Computing

A+ Core 1 · Virtualization and Cloud Computing

8 practice questions

Troubleshooting Hardware, Drives, Displays & Mobile Devices

A+ Core 1 · Hardware and Network Troubleshooting

8 practice questions

Troubleshooting Network & Printer Issues

A+ Core 1 · Hardware and Network Troubleshooting

8 practice questions

OS Types, Installations & Windows Editions

A+ Core 2 · Operating Systems

8 practice questions

Windows Tools, Command Line, Settings & Networking

A+ Core 2 · Operating Systems

8 practice questions

macOS, Linux, Applications & Cloud Tools

A+ Core 2 · Operating Systems

8 practice questions

Security Measures, Windows Security & Wireless Security

A+ Core 2 · Security

8 practice questions

Malware, Social Engineering, Hardening & Data Disposal

A+ Core 2 · Security

8 practice questions

Troubleshooting Windows & Mobile OS Issues

A+ Core 2 · Software Troubleshooting

8 practice questions

Troubleshooting Mobile & PC Security Issues

A+ Core 2 · Software Troubleshooting

8 practice questions

Operational Procedures: Documentation, Safety, Backups & Professionalism

A+ Core 2 · Operational Procedures

8 practice questions

How Cert Prep Club works

Pick your certification and work through its study guides, one domain at a time. Every guide ends with practice questions that explain why each answer is right — and why the alternatives are wrong. When you feel ready, take the timed mock test: it scores you by domain and points you back to the guides you need to re-study.

Every question on this site is written by us from the official exam objectives and passes a four-pass verification process before publication. Read the full process on our How we write and verify questions page. Your progress — answers, bookmarks, missed questions, readiness score, exam date — is stored in your own browser, so no account is needed.

Cert Prep Club is free, and the free material stays free. If you spot a mistake, every question has a "Report an error" link, and verified fixes are recorded on our corrections page.

Frequently Asked Questions

Is Cert Prep Club really free?

Yes. Every study guide, practice question, and mock test on Cert Prep Club is completely free, with no signup, no account, and no paywall.

Do I need to create an account to use the quizzes?

No. Your practice answers, bookmarks, missed-question deck, and readiness score are stored in your own browser, so no account is needed — but your progress does not follow you to another device.

Are your practice questions real exam questions?

No. Every question is written by us from the official exam objectives published by the certifying body. We never copy real exam questions or use brain dumps — that would be copyright infringement and would teach memorisation instead of understanding.

How accurate are the answers?

Every question passes a four-pass verification process before publication: source-first writing from official objectives, independent re-derivation of the answer, a distractor check, and a wording check. We cannot promise zero errors, but we fix verified errors quickly and record every fix on our corrections page.

What does the 70% pass mark on mock tests mean?

It is a study guide only, not the real pass mark. Some exam vendors (including AWS) use scaled scoring and do not publish a percentage pass mark. If you consistently score above 70% across all domains on our mock tests, you are in a good position — but always check the official exam guide for the real requirements.

Which certification should I start with?

It depends on your field. For cloud, the AWS Solutions Architect – Associate is the most widely held starting point. For cybersecurity, CompTIA Security+ is the standard entry certification. For project management, the PMP is the benchmark — though it requires real project experience to sit the exam.

Advertisement