CCNA 200-301 Exam Prep
Free Cisco Certified Network Associate study guides, practice questions with explanations, and a timed mock test — no signup, no paywall.
CCNA exam facts
- Exam code
- 200-301
- Exam version
- 200-301 v1.1 (current until 2 Feb 2027)
- Exam fee
- $300 USD
- Questions
- 100–120 (approx.; Cisco does not publish a count) (real exam)
- Duration
- 120 minutes (real exam)
- Passing score
- Not published by Cisco
Exam domains
How the real exam is weighted:
The Cisco Certified Network Associate (CCNA) is the most widely recognised entry-level networking certification in the world. It is earned by passing a single exam, 200-301, and it proves you can build, configure, secure, and troubleshoot the networks that businesses run on: switches, routers, wireless access points, IP addressing, routing protocols, network services, and the basics of automation. If you want a job as a network technician, network administrator, or junior network engineer — or you want to move from general IT support into networking — the CCNA is the usual first step, and employers ask for it by name in job listings across the US, UK, Canada, and Australia.
The current version of the exam is 200-301 v1.1, in effect since 20 August 2024. Cisco has announced that v1.1 will be replaced by v2.0 on 3 February 2027 (the last day to test on v1.1 is 2 February 2027), keeping the same 200-301 exam number but reorganising the content into five domains with a heavier emphasis on troubleshooting and AI-assisted network operations. If you are studying now, you are preparing for v1.1 — and Cisco itself advises candidates already on the v1.1 path to finish it rather than wait. Everything on this site follows the v1.1 blueprint, and the version notes on each page tell you where v2.0 differs.
What the exam covers
The exam lasts 120 minutes and costs $300 USD (plus local tax), booked through Pearson VUE at a test centre or online with remote proctoring. Cisco does not publish an exact question count; candidates typically report roughly 100 to 120 questions, mixing multiple-choice (single and multiple answer), drag-and-drop, and hands-on simulation items where you work on a simulated Cisco command line. The exam is forward-only: once you move past a question you cannot go back to it, so pacing and confidence in your first answer matter. There are no formal prerequisites — no degree, no earlier certification, and no required training course — although Cisco notes that learners often benefit from a year or so of experience implementing and administering Cisco solutions.
The v1.1 blueprint has six domains, and the weights tell you where to spend your time:
- Network Fundamentals (20%): network devices and their roles, topologies, cabling, TCP vs UDP, IPv4 and IPv6 addressing and subnetting, wireless principles, virtualization, and switching concepts. Subnetting lives here, and it is the single most practised skill on the exam.
- Network Access (20%): VLANs and trunking, EtherChannel, Rapid PVST+ spanning tree, CDP and LLDP discovery, wireless architectures and controllers, and device management access.
- IP Connectivity (25%): the biggest domain. Reading routing tables, how routers choose routes (longest prefix match, administrative distance, metric), static routing, single-area OSPFv2, and first hop redundancy protocols.
- IP Services (10%): NAT, NTP, DHCP and DNS, SNMP, syslog, QoS, SSH, and TFTP/FTP. Small weight, wide surface — easy points if you learn the port numbers and purposes.
- Security Fundamentals (15%): threats and vulnerabilities, device hardening, VPNs, access control lists, Layer 2 security (port security, DHCP snooping, dynamic ARP inspection), AAA, and wireless security protocols.
- Automation and Programmability (10%): how automation changes network management, controller-based and software-defined networking, AI and machine learning in network operations, REST APIs, Ansible and Terraform, and JSON.
Notice that the first three domains together are 65% of the exam. A candidate who is genuinely strong on subnetting, VLANs, spanning tree, and OSPF — and who can read a routing table and a show command output — is most of the way to passing. The remaining domains reward breadth: know the purpose, the port, and the one or two facts the exam asks about each service, and do not over-invest in any single one.
How the exam is scored
Cisco reports results on a scaled score up to 1000 points, and Cisco does not publish the passing score. The cut score is set by statistical analysis and can vary between exam forms. You will often see 825 out of 1000 quoted online; that is an unofficial community estimate drawn from score reports, not a number Cisco stands behind, so treat it as a rough target rather than a fact. The practical consequence is simple: aim to be comfortably strong across all six domains rather than chasing a specific number, and treat a practice-test score in the mid-80s as a reasonable readiness signal. You get your pass/fail result on screen immediately after the exam, with a domain-level score report following in Cisco's Certification Tracking System.
Who the CCNA is for
The CCNA is designed as a starting point: Cisco describes it as assuming little to no networking knowledge. That makes it a good fit for IT support staff moving into networking, career changers with basic computer knowledge, recent graduates, and anyone whose current role touches Cisco equipment. It is also the standard stepping stone to the professional-level CCNP, which builds directly on the routing, switching, and troubleshooting skills the CCNA introduces. The certification is valid for three years, and you renew it by re-passing the exam, passing a higher-level Cisco exam, or earning 30 Continuing Education credits.
How to use this site
Work through the 14 study guides in order — they follow the blueprint from fundamentals to automation, and each one ends with practice questions that explain why the right answer is right and why each wrong answer is wrong. Subnetting and OSPF deserve lab time, not just reading: Cisco Packet Tracer is free for Networking Academy students and is the standard way to practise configuration commands without buying hardware, and Cisco Modeling Labs (CML) offers a free tier. When you can answer the guide questions without hesitation, take the 50-question timed mock test, which mirrors the real exam's domain weights, then use the study planner page to structure your final weeks. The cheat sheet page collects the subnetting tables, port numbers, and command summaries worth memorising in the last few days before your exam date.
What comes after the CCNA
The CCNA is a foundation, not a destination. The natural next step is the professional-level CCNP Enterprise, which deepens the routing, switching, and troubleshooting skills the CCNA introduces and adds advanced topics such as BGP, MPLS, and software-defined WAN. Passing any CCNP exam also renews your CCNA, so the two certifications fit together neatly. Other directions are equally valid: the security track (CCNP Security) builds on the security fundamentals domain, the data centre and service provider tracks go deeper into their own worlds, and many CCNA holders move sideways into cloud networking, where the same routing and switching concepts apply to AWS, Azure, and Google Cloud. Whatever direction you choose, the habits the CCNA teaches — reading output carefully, reasoning from first principles about how packets move, and verifying every change with show commands — are the habits of a working network engineer, and they transfer to every vendor and every technology you will meet next.
Exam-day tips
Book your exam only when you are consistently scoring in the mid-80s on timed practice tests across all six domains, and give yourself a real deadline — an open-ended study plan drifts. In the final week, stop learning new material and switch to review: the cheat sheet, your missed questions, and one more full mock test. On the day, arrive early, read each question twice before answering (the exam rewards careful reading, and several questions turn on a single word such as "not" or "first"), and remember that the exam is forward-only — commit to your answer and move on. Simulation questions are worth more time than multiple-choice ones, so do not let a single difficult question consume ten minutes: answer it as best you can and keep moving.
Study guides
Network Devices, Topologies & Virtualization
Network Fundamentals
Switching Concepts, Cabling & Interface Issues
Network Fundamentals
TCP vs UDP & Verifying Client IP Settings
Network Fundamentals
IPv4 Addressing & Subnetting
Network Fundamentals
IPv6 Addressing & Address Types
Network Fundamentals
VLANs, Trunking & InterVLAN Routing
Network Access
EtherChannel, Spanning Tree & Discovery Protocols
Network Access
Wireless Networking & WLAN Architecture
Network Access
Routing Tables & Forwarding Decisions
IP Connectivity
Static Routing, OSPFv2 & First Hop Redundancy
IP Connectivity
IP Services: NAT, DHCP, DNS, NTP, SNMP, Syslog & QoS
IP Services
Security Concepts, Device Hardening, VPNs & ACLs
Security Fundamentals
Layer 2 Security & Wireless Security
Security Fundamentals
Automation & Programmability
Automation and Programmability
Frequently Asked Questions
How much does the CCNA exam cost?
The 200-301 CCNA exam costs $300 USD (plus local tax), paid when you book through Pearson VUE. Cisco Learning Credits are also accepted. A retake costs the full $300 again, unless you bought Cisco's Exam Safeguard option, which bundles a second attempt. Prices are set by Cisco and can change, so confirm the current fee on Cisco's exam page before you book.
How many questions are on the CCNA exam, and what is the passing score?
Cisco does not publish either number. Candidates typically report roughly 100 to 120 questions in the 120 minutes, and the passing score is set by statistical analysis and varies between exam forms. The figure of 825 out of 1000 is often quoted online, but it is an unofficial community estimate, not a number Cisco publishes. Aim to be comfortably strong across all six domains rather than chasing a specific score.
Which version of the CCNA exam is current — v1.1 or v2.0?
Version 1.1 is current now. It has been in effect since 20 August 2024, and the last day to test on v1.1 is 2 February 2027. Version 2.0 takes over on 3 February 2027 under the same 200-301 exam number, with five domains instead of six and more emphasis on troubleshooting and AI in network operations. Cisco advises candidates already studying v1.1 to finish it rather than wait.
Are there any prerequisites for the CCNA?
No. Cisco lists the prerequisites as 'None' — you do not need a degree, work experience, or an earlier certification. Cisco notes that learners often benefit from about a year of experience implementing and administering Cisco solutions, but that is a recommendation, not a requirement. Many candidates pass with structured self-study plus hands-on lab practice.
How long is the CCNA valid, and how do I renew it?
The CCNA is valid for three years from the date you earn it. You can renew at any time during that period by passing the current CCNA exam again, passing a higher-level Cisco exam (such as a CCNP exam), or earning 30 Continuing Education (CE) credits through approved Cisco training and activities. If the certification expires, you must complete the full exam process again — Cisco does not grant extensions.