AWS SAA Glossary

Key terms and acronyms for the SAA-C03 exam, explained in plain language.

By Abu Anns · Last updated 20 November 2026Exam version: SAA-C03 (current)

AMI (Amazon Machine Image)
A template for launching an EC2 instance, containing the operating system and preinstalled software. AMIs are Regional but can be copied to other Regions.
Auto Scaling group (ASG)
A group of EC2 instances that automatically maintains a desired capacity, replaces failed instances, and scales in or out based on demand or a schedule.
Availability Zone (AZ)
One or more discrete data centers within an AWS Region, isolated from failures in other AZs. Architectures span at least two AZs for high availability.
AWS Region
A geographic area containing multiple Availability Zones. Resources such as EC2 instances and RDS databases live in a specific Region.
Amazon Aurora
AWS's cloud-native relational database, compatible with MySQL and PostgreSQL, with storage replicated six ways across three AZs and up to 15 read replicas.
AWS WAF
A web application firewall that filters HTTP(S) requests in front of CloudFront, ALB, or API Gateway, blocking attacks such as SQL injection and cross-site scripting.
CloudFront
Amazon's content delivery network (CDN), which caches content at edge locations worldwide so users download from a nearby location.
CloudTrail
The AWS auditing service that records API calls in an account: who did what, when, and from where.
CloudWatch
The AWS monitoring service for metrics, logs, and alarms, used to observe performance and health and to trigger automated actions.
Amazon Cognito
A service that authenticates users of web and mobile applications and provides them with temporary AWS credentials.
Direct Connect
A dedicated private network connection from an on-premises data center into AWS, with consistent bandwidth and no public internet traversal.
DynamoDB
A fully managed NoSQL key-value and document database delivering single-digit-millisecond performance at any scale.
EBS (Elastic Block Store)
Persistent block storage volumes for EC2 instances, scoped to a single Availability Zone and replicated within it.
EC2 (Elastic Compute Cloud)
Virtual servers in the AWS Cloud, available in many instance families and purchasing options.
EFS (Elastic File System)
A managed NFS file system that many EC2 instances can mount simultaneously across Availability Zones, scaling automatically.
ElastiCache
A managed in-memory caching service (Redis or Memcached) that sits in front of a database to absorb repeated reads.
Elastic Load Balancer (ELB)
A managed load balancer that distributes traffic across healthy targets. Types: Application (Layer 7), Network (Layer 4), Gateway (Layer 3 appliances).
Global Accelerator
A networking service that improves latency for non-cacheable traffic by routing users onto the AWS global network at the nearest edge location, with static IPs and fast Region failover.
GuardDuty
A threat-detection service that uses machine learning and threat intelligence to flag suspicious activity such as compromised instances or malicious IPs.
IAM (Identity and Access Management)
The AWS service that controls who can do what in an account, through users, groups, roles, and policies.
KMS (Key Management Service)
The AWS service for creating and managing encryption keys, with key policies, auditing via CloudTrail, and automatic rotation.
Lambda
A serverless compute service that runs code in response to events, scaling automatically and charging only for the compute time used. Maximum execution time is 15 minutes.
MFA (Multi-Factor Authentication)
An additional authentication factor (such as a code from an authenticator app) required alongside a password, protecting accounts even if the password is stolen.
Multi-AZ
A deployment spanning two or more Availability Zones, used by services such as RDS to provide automatic failover if one AZ fails.
NACL (Network ACL)
A stateless, subnet-level firewall in a VPC with numbered allow/deny rules. Return traffic must be explicitly allowed.
NAT gateway
A managed service in a public subnet that lets resources in private subnets initiate outbound internet traffic without being reachable from the internet.
RDS (Relational Database Service)
A managed relational database service supporting MySQL, PostgreSQL, MariaDB, Oracle, and SQL Server, with automated backups, patching, and Multi-AZ failover.
Route 53
Amazon's DNS service, which registers domains, hosts DNS zones, and routes users to AWS resources using health-aware routing policies.
RPO (Recovery Point Objective)
The maximum acceptable amount of data loss in a disaster, measured in time: the age of the oldest data you can afford to restore from.
RTO (Recovery Time Objective)
The maximum acceptable downtime after a disaster: how long the business can be offline while service is restored.
S3 (Simple Storage Service)
Amazon's object storage service, offering 99.999999999% (eleven nines) durability across multiple Availability Zones.
Savings Plan
A 1- or 3-year commitment to a level of compute usage in exchange for a discounted rate (up to about 72% off On-Demand), more flexible than Reserved Instances.
Secrets Manager
A service for storing secrets such as database credentials and API keys, with automatic rotation on a schedule.
Security group
A stateful, instance-level virtual firewall in a VPC. It supports allow rules only, and return traffic is automatically allowed.
SNS (Simple Notification Service)
A publish/subscribe messaging service: one message published to a topic is delivered to all subscribers (queues, functions, email, and more).
Spot Instance
Spare EC2 capacity offered at discounts of up to 90%, which AWS can reclaim with a two-minute warning. Suitable only for fault-tolerant, interruptible workloads.
SQS (Simple Queue Service)
A managed message queue that decouples application components, buffering messages so producers and consumers can work at different speeds.
Transit Gateway
A central hub that connects many VPCs and on-premises networks, replacing a mesh of individual VPC peering connections.
VPC (Virtual Private Cloud)
A logically isolated virtual network in AWS where you launch resources, controlling IP ranges, subnets, route tables, and gateways.
VPC endpoint
A private connection from a VPC to an AWS service that keeps traffic off the public internet. Gateway endpoints serve S3 and DynamoDB; interface endpoints (PrivateLink) serve other services.
VPC peering
A direct private connection between two VPCs. Peering is not transitive, and the VPCs cannot have overlapping CIDR ranges.
AWS Config
A service that records the configuration of AWS resources over time and evaluates them against rules, flagging non-compliant resources.
Placement group
A setting that controls how EC2 instances are physically placed: cluster (close together, low latency), spread (distinct hardware), or partition (separate racks).
Advertisement