AZ-305 Glossary
Key terms and acronyms for the AZ-305 exam, explained in plain language.
- ABAC
- Attribute-based access control: Azure RBAC extended with conditions based on resource attributes, such as blob tags.
- AKS
- Azure Kubernetes Service: Microsoft's managed Kubernetes platform for container orchestration.
- APIM
- Azure API Management: a gateway service for publishing, securing, and managing APIs.
- App Service
- Azure's platform-as-a-service hosting for web applications, APIs, and mobile backends.
- ASR
- Azure Site Recovery: replication-based disaster recovery for VMs and on-premises servers.
- Availability set
- A grouping of VMs across fault domains and update domains within a single datacentre.
- Availability zone
- A physically separate datacentre (or group) within an Azure region, with independent power, cooling, and networking.
- Bastion
- Azure Bastion: secure browser-based RDP/SSH access to VMs without public IP addresses.
- CAF
- Cloud Adoption Framework for Azure: Microsoft's methodology for cloud adoption, including landing zones and migration strategies.
- CDN
- Content delivery network: caches content at edge locations close to users to reduce latency.
- Conditional Access
- Microsoft Entra ID policy engine that enforces controls (MFA, device compliance, blocking) based on sign-in signals.
- Cosmos DB
- Azure's globally distributed multi-model database with single-digit-millisecond latency and five consistency levels.
- DCR
- Data collection rule: defines what the Azure Monitor Agent collects from machines and where it sends it.
- DMS
- Azure Database Migration Service: migrates databases to Azure with minimal downtime using continuous replication.
- Entra ID
- Microsoft Entra ID (formerly Azure Active Directory): Microsoft's cloud identity and access management service.
- Event Grid
- Azure's event routing service for discrete events, enabling event-driven architectures.
- Event Hubs
- Azure's big-data streaming ingestion service for millions of events per second.
- ExpressRoute
- A private, dedicated network connection between on-premises infrastructure and Azure.
- Front Door
- Azure's global layer-7 load balancer with anycast routing, caching, and WAF.
- HSM
- Hardware security module: dedicated hardware for protecting cryptographic keys.
- KQL
- Kusto Query Language: the query language for Log Analytics and Azure Data Explorer.
- Landing zone
- A pre-configured Azure environment with networking, identity, governance, and security ready for workloads.
- Log Analytics
- Azure Monitor's log storage and query service, based on workspaces and KQL.
- Managed identity
- An Entra ID identity managed by Azure for an Azure resource, removing the need for stored credentials.
- NAT Gateway
- Azure's managed outbound internet connectivity service for subnets, providing a static public IP and large SNAT port pool.
- NSG
- Network security group: filters network traffic to subnets and network interfaces using allow/deny rules.
- PIM
- Privileged Identity Management: just-in-time privileged role activation with approval and time limits.
- Private endpoint
- A private IP address inside a VNet that connects to a PaaS service via Azure Private Link.
- RBAC
- Role-based access control: Azure's authorisation system assigning roles to principals at a scope.
- RPO
- Recovery point objective: the maximum acceptable data loss, measured in time.
- RTO
- Recovery time objective: the maximum acceptable downtime after a disaster.
- RU
- Request Unit: the measure of throughput in Azure Cosmos DB.
- Service Bus
- Azure's enterprise message broker with queues, topics, ordering, and transactions.
- SIEM
- Security information and event management: centralised collection and analysis of security events (Microsoft Sentinel).
- SLA
- Service-level agreement: the availability target a service commits to, backed by service credits.
- SOAR
- Security orchestration, automation, and response: automated incident response, provided in Sentinel via playbooks.
- Synapse
- Azure Synapse Analytics: unified analytics service combining warehousing, Spark, and data integration.
- TDE
- Transparent data encryption: encrypts database data at rest.
- Traffic Manager
- Azure's DNS-based global load balancer with multiple routing methods.
- UDR
- User-defined route: a custom route table entry overriding Azure's default routing, commonly used for forced tunnelling.
- VNet
- Virtual network: the isolated network boundary in Azure.
- WAF
- Web Application Firewall: protects web applications from OWASP Top 10 attacks such as SQL injection and cross-site scripting.
- Zone redundancy
- Replication of a service or data across availability zones within a region.
Advertisement