A+ Core 1 Glossary
Key terms and acronyms for the 220-1201 exam, explained in plain language.
- ADF (Automatic Document Feeder)
- A scanner attachment that feeds multi-page documents through automatically, one page at a time. Used on multifunction printers for scanning or copying stacks of loose pages.
- APIPA (Automatic Private IP Addressing)
- The address a Windows host assigns itself (169.254.0.0/16) when it cannot reach a DHCP server. An APIPA address is a strong clue that DHCP is failing.
- ARM
- A CPU architecture designed for power efficiency, used in phones, tablets, and increasingly in laptops. Contrasts with x86/x64, the architecture used in most desktops and servers.
- BIOS/UEFI
- The firmware that starts a computer and provides low-level hardware settings. UEFI is the modern replacement for legacy BIOS, supporting Secure Boot and larger drives.
- CMOS battery
- A small coin-cell battery on the motherboard that powers the real-time clock and preserves BIOS settings when the computer is unplugged. When it dies, the date and time reset on every boot.
- DHCP (Dynamic Host Configuration Protocol)
- The service that automatically assigns IP addresses, subnet masks, gateways, and DNS servers to devices on a network. Uses UDP ports 67 (server) and 68 (client).
- DIMM/SODIMM
- Memory module form factors: DIMM (dual in-line memory module) for desktops, SODIMM (small outline DIMM) for laptops. They are not interchangeable.
- DMARC
- Domain-based Message Authentication, Reporting, and Conformance: a DNS TXT record policy telling receiving mail servers what to do with mail that fails SPF or DKIM checks.
- DNS (Domain Name System)
- The system that translates human-readable domain names into IP addresses. Uses UDP port 53 for normal lookups and TCP for large responses.
- ECC RAM
- Error-correcting code RAM: memory that detects and corrects single-bit errors. Used in servers and workstations where data integrity matters; cannot be mixed with non-ECC RAM.
- ESD (Electrostatic Discharge)
- A sudden flow of static electricity that can damage sensitive computer components. Prevented with ESD straps, mats, and antistatic bags.
- Hypervisor
- Software that creates and manages virtual machines. Type 1 (bare-metal) runs directly on hardware; Type 2 (hosted) runs as an application inside an operating system.
- IaaS (Infrastructure as a Service)
- A cloud service model where the provider supplies virtual machines, storage, and networking, and the customer manages the operating system and applications.
- IMAP (Internet Mail Access Protocol)
- An email retrieval protocol (port 143) that keeps mail on the server and synchronizes it across devices. Contrasts with POP3, which downloads mail to one device.
- IPS (In-Plane Switching)
- An LCD panel type with wide viewing angles and accurate colour, preferred for office and creative work. Contrasts with TN (fast, poor colour) and VA (high contrast, slower).
- M.2
- A small form-factor slot and module standard used for SSDs and wireless cards, plugging directly into the motherboard. M.2 SSDs may use SATA or the much faster NVMe interface.
- MDM (Mobile Device Management)
- Software for managing fleets of mobile devices: pushing configurations, enforcing policies, distributing apps, and remotely wiping lost or stolen devices.
- NVMe (Non-Volatile Memory Express)
- A storage interface designed for SSDs, running over PCIe. Far faster than SATA (several GB/s vs about 600 MB/s).
- OLED
- Organic light-emitting diode: a display technology in which each pixel produces its own light, giving perfect blacks and high contrast. Can suffer burn-in from static images.
- PaaS (Platform as a Service)
- A cloud service model where the provider manages the operating system and runtime, and the customer deploys applications onto the platform.
- PCL (Printer Control Language)
- A printer language developed by HP, widely used for general office printing. Contrasts with PostScript, which is preferred for graphics and desktop publishing.
- PoE (Power over Ethernet)
- Technology that delivers electrical power over Ethernet cables, powering access points, IP phones, and cameras without a separate power supply. 802.3af (15.4W), 802.3at/PoE+ (30W), 802.3bt/PoE++ (60–100W).
- POP3 (Post Office Protocol 3)
- An email retrieval protocol (port 110) that downloads mail to one device and usually deletes it from the server. Contrasts with IMAP, which keeps mail on the server.
- POST (Power-On Self-Test)
- The diagnostic sequence a computer runs at startup to check hardware. Failures are reported with beep codes or on-screen messages.
- RAID (Redundant Array of Independent Disks)
- A way of combining multiple drives for speed, redundancy, or both. RAID 0 stripes (no redundancy), RAID 1 mirrors, RAID 5 stripes with parity, RAID 6 uses double parity, RAID 10 mirrors and stripes.
- RDP (Remote Desktop Protocol)
- Microsoft's protocol (TCP port 3389) for remote graphical access to a Windows computer.
- S.M.A.R.T.
- Self-Monitoring, Analysis, and Reporting Technology: a drive self-diagnostic system that predicts drive failure. A S.M.A.R.T. failure warning means the drive should be replaced promptly.
- SaaS (Software as a Service)
- A cloud service model where the provider runs a complete application and the customer simply uses it, usually through a web browser. Examples include webmail and online office suites.
- SATA
- Serial ATA: the standard interface for internal hard drives and SSDs, with a maximum throughput of about 600 MB/s. eSATA is the external variant.
- SMTP (Simple Mail Transfer Protocol)
- The protocol (port 25) used to send email between mail servers and from a client to its outgoing mail server.
- SSH (Secure Shell)
- An encrypted protocol (TCP port 22) for remote command-line access. The secure replacement for Telnet, which sends everything in plaintext.
- TPM (Trusted Platform Module)
- A hardware chip that stores encryption keys and supports security features such as BitLocker drive encryption and Secure Boot.
- VDI (Virtual Desktop Infrastructure)
- A system in which users' desktop operating systems run as virtual machines on central servers, accessed from thin clients or ordinary PCs.
- VLAN (Virtual LAN)
- A logical grouping of devices on a switch that behave as if on the same network, isolated from other VLANs. Used to segment traffic for security and performance.
- VPN (Virtual Private Network)
- An encrypted tunnel over an untrusted network (such as the internet) that lets a remote user access a private network securely.
Advertisement