CCNA Glossary
Key terms and acronyms for the 200-301 exam, explained in plain language.
- Access port
- A switch port assigned to a single VLAN, carrying untagged traffic for that VLAN. Used for endpoints such as PCs and printers.
- Administrative distance (AD)
- A value measuring how trustworthy a routing source is. Lower AD wins between routes to the same destination: connected 0, static 1, EIGRP 90, OSPF 110, RIP 120.
- Anycast
- A unicast address assigned to multiple devices, so a packet is delivered to the nearest one by routing. Used by DNS root servers and content delivery networks.
- APIPA
- Automatic Private IP Addressing: a Windows host that cannot reach a DHCP server assigns itself an address in the 169.254.0.0/16 range.
- BPDU
- Bridge Protocol Data Unit: the message switches exchange to run Spanning Tree Protocol, carrying bridge IDs and path costs.
- BPDU guard
- A spanning tree feature that error-disables a PortFast port if it receives a BPDU, indicating a switch was connected where an endpoint was expected.
- Broadcast domain
- The set of devices that receive each other's broadcast frames. Switches forward broadcasts; routers block them, so each VLAN and subnet is a separate broadcast domain.
- CAPWAP
- Control and Provisioning of Wireless Access Points: the tunnelling protocol between a lightweight access point and its wireless LAN controller.
- CDP
- Cisco Discovery Protocol: Cisco's proprietary Layer 2 protocol for discovering directly connected Cisco neighbours. Enabled by default.
- Collision domain
- A network segment where two devices transmitting simultaneously cause a collision. Modern full-duplex switched links effectively eliminate collision domains.
- Default gateway
- The router (or Layer 3 switch) a host sends traffic to when the destination is on another subnet. Configured on the host as its gateway address.
- DHCP snooping
- A Layer 2 security feature that drops DHCP server messages arriving on untrusted ports, blocking rogue DHCP servers, and builds a binding table of legitimate IP-to-MAC mappings.
- DR/BDR
- Designated Router and Backup Designated Router: the OSPF routers elected on a multi-access network to reduce adjacency overhead. Elected by highest priority, then highest router ID.
- DTP
- Dynamic Trunking Protocol: Cisco's protocol for negotiating trunk links between switches. Dynamic desirable initiates; dynamic auto only responds.
- Dynamic ARP inspection (DAI)
- A Layer 2 security feature that validates ARP packets against the DHCP snooping binding table, dropping spoofed ARP replies.
- EtherChannel
- A bundle of up to eight physical links acting as one logical link, combining bandwidth and providing redundancy. Negotiated with LACP or PAgP.
- Floating static route
- A static route configured with an administrative distance higher than the dynamic protocol it backs up, so it enters the routing table only when the primary route fails.
- Gateway of last resort
- The default route (0.0.0.0/0): the route a router uses for packets that match no more specific route.
- HSRP
- Hot Standby Router Protocol: Cisco's proprietary first hop redundancy protocol, in which routers share a virtual IP address so hosts keep a working gateway if one router fails.
- LACP
- Link Aggregation Control Protocol (IEEE 802.3ad): the open-standard protocol for negotiating EtherChannel bundles. Active mode initiates, passive mode responds.
- Link-local address
- An IPv6 address in the fe80::/10 range, automatically configured on every IPv6 interface and valid only on the local link. Never routed.
- LLDP
- Link Layer Discovery Protocol (IEEE 802.1ab): the vendor-neutral Layer 2 discovery protocol. Not enabled by default on Cisco devices.
- Longest prefix match
- The first rule of router forwarding decisions: the router uses the most specific (longest-prefix) route matching the destination, regardless of administrative distance or metric.
- MAC address table
- The switch's table mapping MAC addresses to ports, built by learning source addresses from incoming frames. Entries age out after 300 seconds by default.
- NAT
- Network Address Translation: translating private inside addresses to public outside addresses at an edge router, so private networks can reach the internet.
- Native VLAN
- The VLAN whose traffic crosses an 802.1Q trunk untagged. It must match on both ends of the trunk; default is VLAN 1.
- OSPF
- Open Shortest Path First: a link-state routing protocol using Dijkstra's algorithm. AD 110; metric is cost (reference bandwidth / interface bandwidth).
- PAT
- Port Address Translation (NAT overload): mapping many private addresses to a single public address by giving each connection a unique source port.
- PoE
- Power over Ethernet: delivering electrical power to a device over its Ethernet cable. 802.3af up to 15.4W, 802.3at (PoE+) up to 30W, 802.3bt (PoE++) up to 60/100W.
- PortFast
- A spanning tree feature that lets an access port skip the listening and learning states and go straight to forwarding. For endpoints only.
- QoS
- Quality of Service: managing how different traffic types are treated when bandwidth is limited, through classification, marking, queuing, policing, and shaping.
- Root bridge
- The switch with the lowest bridge ID in a spanning tree instance, serving as the reference point for all path calculations.
- SLAAC
- Stateless Address Autoconfiguration: an IPv6 host building its own address from the prefix in a Router Advertisement, with no server required.
- SNMP
- Simple Network Management Protocol: the protocol for monitoring and managing network devices. Uses UDP 161 (queries) and 162 (traps); v3 adds authentication and encryption.
- SSID
- Service Set Identifier: the name of a wireless network, broadcast by access points so clients can find and join it.
- SVI
- Switched Virtual Interface: a virtual Layer 3 interface on a switch (interface vlan 10) with an IP address, used as the default gateway for that VLAN and for interVLAN routing.
- Syslog
- The standard for collecting log messages from network devices on a central server. Uses UDP 514; severity levels run from 0 (Emergency) to 7 (Debugging).
- Trunk port
- A switch port that carries traffic for multiple VLANs, tagging frames with 802.1Q to identify their VLAN.
- VLAN
- Virtual Local Area Network: a logical grouping of switch ports that behaves as a separate network, with its own broadcast domain and subnet.
- VRF
- Virtual Routing and Forwarding: maintaining multiple independent routing tables on one physical router, isolating traffic between them.
- VRRP
- Virtual Router Redundancy Protocol: the open-standard first hop redundancy protocol, in which routers share a virtual IP gateway address.
- Wildcard mask
- The inverse of a subnet mask, used in ACLs and OSPF network statements: 0 means the bit must match, 1 means it can be anything. For a /24 network, the wildcard mask is 0.0.0.255.
- WPA2/WPA3
- Wi-Fi Protected Access versions 2 and 3: the wireless security standards. WPA2 uses AES/CCMP encryption; WPA3 uses SAE, resisting offline dictionary attacks and adding forward secrecy.
Advertisement