A+ Core 1 FAQ

Frequently asked questions about the 220-1201 exam: cost, format, passing score, and how to prepare.

By Abu Anns · Last updated 20 November 2026Exam version: 220-1201 (V15, current)

Frequently Asked Questions

How long does it take to study for A+ Core 1?

Most candidates need 4–8 weeks studying 1–2 hours a day, depending on experience. If you already build PCs or work in IT support, 2–4 weeks of focused study may be enough. Complete beginners should allow 8–12 weeks and include hands-on practice — taking apart an old PC, setting up a home network, and configuring a printer teach more than reading alone. Our study planner page has 2-week, 4-week, and 8-week plans.

Should I take Core 1 or Core 2 first?

Either order works — CompTIA does not require a sequence, and both exams must be from the same V15 series. Most candidates start with Core 1 because its hardware and networking content feels more concrete, then move to Core 2. If you are stronger on operating systems and security, starting with Core 2 is equally valid. Many candidates sit the two exams a few weeks apart.

Are there performance-based questions (PBQs) on Core 1?

Yes. Core 1 includes performance-based questions alongside multiple-choice and drag-and-drop items. PBQs are short simulations: matching cables to ports, configuring a SOHO router, ordering troubleshooting steps, or identifying a faulty component from symptoms. They usually appear at the start of the exam. Practice by doing the hands-on tasks in the guides rather than only reading about them.

Do I need hands-on experience before taking Core 1?

CompTIA recommends about 12 months of hands-on experience in an IT support role, but it is not a requirement — anyone can book the exam. The exam is scenario-heavy, so practical familiarity helps enormously: if you have never opened a PC case or configured a router, spend time doing those things before the exam. A cheap second-hand desktop to disassemble and reassemble is one of the best study investments you can make.

What is the difference between the 220-1201 and the old 220-1101 exam?

220-1201 is the V15 Core 1 exam, launched 25 March 2025, replacing 220-1101 (V14), which retired on 25 September 2025. The format is the same (maximum 90 questions, 90 minutes, passing score 675), but the domain weights shifted slightly: Networking rose from 20% to 23%, Mobile Devices fell from 15% to 13%, and Hardware and Network Troubleshooting fell from 29% to 28%. Some objectives were updated for newer technology. Study material written for 220-1101 is partly out of date.

How long is the A+ certification valid?

Three years from the date you pass the second of the two exams. You can renew by earning 20 continuing education units (CEUs) over the three years plus CompTIA's CE fee, by completing CompTIA's CertMaster CE course, by passing the newest version of the A+ exams, or by earning a higher CompTIA certification such as Network+ or Security+, which automatically renews A+.

Advertisement