PMP Cheat Sheet
Quick-reference summary of the key facts for the PMP exam.
PMP Cheat Sheet — July 2026 ECO
Final revision for the PMP exam. Read the guides for the reasoning; use this page to lock in the facts.
Exam at a glance
| Item | Current exam (July 2026 ECO) |
|---|---|
| Questions | 180 (170 scored + 10 unscored pretest) |
| Time | 240 minutes, two 10-minute breaks (first after the case-study section) |
| Domains | People 33% · Process 41% · Business Environment 26% |
| Tasks | 26 (8 People, 10 Process, 8 Business Environment) |
| Approaches | ~40% predictive, ~60% agile / adaptive / hybrid |
| Passing score | Not published by PMI |
| Fee | $675 non-member; members pay less (confirm the current member rate on pmi.org) |
| Renewal | 60 PDUs per 3-year cycle |
The PMI mindset (answers most situational questions)
- Understand before you act. Assess, analyze, review, talk to the people involved — then decide.
- Servant leadership. Serve the team, remove obstacles, coach rather than punish.
- Resolve at the lowest level. Escalation is a later step, never the first move.
- Agile-first. When requirements are unclear or feedback matters, prefer iterative delivery.
- Never punish, blame, or decide alone as a first step. Involve the people affected.
- Report bad news promptly — with facts and a proposed response.
- Compliance is not negotiable. No schedule or cost pressure justifies breaking a law, regulation, or safety rule.
People domain — key models
- Team development stages: forming → storming → norming → performing → adjourning.
- Conflict styles: collaborate/problem-solve (default, win-win) · compromise (second best, both give up something) · accommodate (yield) · force/direct (emergencies and safety only) · withdraw/avoid (trivial issues, cooling off).
- Power/interest grid: high power + high interest = manage closely; high power + low interest = keep satisfied; low power + high interest = keep informed; low power + low interest = monitor.
- Engagement levels: unaware → resistant → neutral → supportive → leading.
- Communication channels: n(n-1)/2. 10 people = 45 channels.
- Communication methods: interactive (meetings, calls — best for complex/sensitive) · push (email, reports) · pull (repositories, intranet).
- Knowledge: explicit (written down) vs tacit (in people's heads — transferred by mentoring and pairing). Lessons learned are captured throughout the project, not only at closure.
Process domain — key formulas
- PERT: expected = (O + 4M + P) / 6; standard deviation = (P − O) / 6.
- EVM variances: CV = EV − AC (negative = over budget); SV = EV − PV (negative = behind schedule).
- EVM indices: CPI = EV / AC (<1 = over budget); SPI = EV / PV (<1 = behind schedule).
- EAC: one-off variance → AC + (BAC − EV); continuing performance → BAC / CPI; cost + schedule impact → AC + [(BAC − EV) / (CPI × SPI)].
- ETC = EAC − AC. VAC = BAC − EAC (negative = forecast overrun). TCPI = (BAC − EV) / (BAC − AC).
- Budget = cost baseline + management reserve. Contingency reserve is inside the baseline (known risks); management reserve is outside it (unknown risks, sponsor-controlled).
- Critical path: longest path through the network; zero float. Only critical path work shortens the project.
- Crashing = add resources (costs money). Fast tracking = overlap sequential activities (adds risk). Fast track first, then crash.
- Resource leveling can extend the schedule; resource smoothing works within float and does not change the end date.
- EMV = probability × impact.
Process domain — key distinctions
- Scope creep = uncontrolled expansion (stakeholder-driven). Gold plating = team adds unrequested features. Both are always wrong.
- Validate scope = customer formally accepts deliverables. Control scope = monitor the baseline, manage changes.
- Manage quality = audit the process. Control quality = inspect the deliverable.
- Cost of quality: prevention (cheapest) → appraisal → internal failure → external failure (most expensive).
- Quality tools: Pareto = rank causes by frequency; fishbone = root cause; control chart = process stability (rule of seven: 7 points on one side = investigate).
- Quality vs grade: quality = fitness for purpose; grade = category of features. Low grade can be high quality.
- Contracts: fixed-price = seller bears cost risk (well-defined scope); cost-reimbursable = buyer bears cost risk (uncertain scope); T&M = shared risk. Lowest bid is not automatically best. Contract changes must be in writing.
- RACI: exactly ONE person Accountable per activity.
- Project selection: higher NPV wins; BCR must exceed 1.0.
- Outputs vs outcomes: delivering features is not success unless the customer gains value. MVP = smallest releasable version that generates learning.
Business Environment domain — key ideas
- Governance: who decides what; phase gates are governance decisions (continue / change / stop). Sunk costs must not drive the decision.
- PMO types: supportive (templates, coaching) · controlling (requires compliance) · directive (manages projects directly).
- Ethics: disclose conflicts of interest; decline improper gifts; protect confidentiality; never falsify reports.
- Risk responses — threats: avoid (eliminate) · mitigate (reduce probability/impact) · transfer (insurance, fixed-price contract) · accept (deliberate, often with contingency plan) · escalate (beyond your authority).
- Risk responses — opportunities: exploit · enhance · share · accept · escalate.
- Risk terms: trigger = condition that activates a response; secondary risk = new risk created by a response; residual risk = risk remaining after a response. A risk that occurs becomes an issue.
- Change control: document → assess full impact → CCB decides → update plan/baselines → communicate → implement. Never implement before approval. Never split a change to stay under an approval threshold.
- Agile change: requests go to the product owner and the backlog; sprint scope is protected.
- Impediments: the project manager removes them — never tell the team to work around a blockage indefinitely.
- Organizational change: resistance is normal — understand it, involve people, train and support them. Forcing change by authority fails.
- Benefits: the sponsor owns benefits realization after closure; the project manager delivers the capability. Benefits must be measurable (KPIs).
- External environment: monitor it (PESTLE/SWOT), assess impact, raise changes that affect the business case. The 2026 ECO names AI and sustainability as key trends.
Numbers to remember
- 180 questions, 240 minutes, 170 scored + 10 pretest, two 10-minute breaks.
- Domains: People 33%, Process 41%, Business Environment 26%. Tasks: 26 (8/10/8).
- Eligibility: 60 / 48 / 36 / 24 months (secondary / associate / bachelor's / GAC degree), within 10 years, + 35 training hours (or active CAPM).
- Fee: $675 non-member (confirm member rate on pmi.org). Retake ~$275 member / ~$375 non-member (confirm on pmi.org).
- Application review ~5 calendar days; 1-year eligibility window; up to 3 attempts; 60 PDUs per 3-year cycle.