Printers & Multifunction Devices
A+ Core 1 220-1201 · Hardware
Printers are a surprisingly large part of the hardware domain — two full objectives cover deploying and configuring them, plus maintenance for all four printer types. They also reappear in the troubleshooting domain. The exam treats printers as a core support skill because, in real IT support jobs, printers generate a disproportionate share of tickets.
Deploying and configuring printers
Deployment starts with the physical setup: unbox the device, remove all packing materials and transit locks, and choose a location with ventilation, a stable surface, and access to power and network. Then install the appropriate drivers for the operating system — the wrong driver is one of the most common causes of garbled output. The two main printer languages are PCL (Printer Control Language), developed by HP and widely used for general office printing, and PostScript, developed by Adobe and preferred for graphics-heavy and desktop-publishing work. A printer that supports both should use the driver matching the workload. Firmware should be updated during setup, as it fixes bugs and security issues.
Device connectivity can be USB (direct connection to one computer), Ethernet (wired network), or wireless (Wi-Fi, including Wi-Fi Direct for printing without a network). For public/shared devices, the printer can be shared from a computer (a printer share) or hosted on a dedicated print server, which is the better option for offices because it centralizes driver management and queuing. Configuration settings include duplex (double-sided printing), orientation (portrait or landscape), tray settings (which paper size and type each tray holds), and print quality (draft, normal, best — higher quality uses more toner or ink and prints more slowly).
Security matters more than most people expect: modern multifunction devices store copies of scanned and printed documents on internal drives. The exam lists user authentication (requiring a login or PIN before printing), badging (tapping an ID badge to release a print job), audit logs (records of who printed what), and secured prints (jobs held on the printer until the user authenticates at the device, so confidential documents are not left sitting in the output tray). Network scan services let a multifunction device scan to email, to an SMB file share, or to cloud services. The scanning hardware is either an ADF (automatic document feeder), which feeds multi-page documents through automatically, or a flatbed scanner, where each page is placed on the glass — the flatbed is better for books, fragile documents, and single pages.
Printer types and maintenance
Laser printers use a laser to create an electrostatic image on a drum, which attracts toner (powdered plastic) that is then fused onto the paper with heat. They are fast, produce sharp text, and have a low cost per page, making them the office standard. Laser maintenance: replace the toner cartridge when print quality fades, apply a maintenance kit (typically a new fuser, rollers, and separation pads) at the manufacturer's recommended page count, calibrate the printer, and clean it — including vacuuming spilled toner with a toner-rated vacuum (a regular vacuum can blow fine toner particles into the air).
Inkjet printers spray tiny droplets of liquid ink onto the paper. They are cheap to buy, good for photos, and have a higher cost per page than lasers. The key consumables are the ink cartridge, printhead, roller, and feeder. Inkjet maintenance: clean the printheads (a built-in cleaning cycle, or manually if clogged), replace cartridges when empty, calibrate the printhead alignment, and clear jams carefully by pulling paper in the direction of the paper path.
Thermal printers use heat to print on special heat-sensitive paper — the kind used for receipts, shipping labels, and barcodes. They have no ink or toner, which makes them cheap to run, but the paper fades over time and the printhead is a wear item. Maintenance: replace the paper, clean the heating element, remove debris from the feed assembly, and always use the correct special thermal paper — ordinary paper will not work. Impact printers (dot-matrix) strike an inked ribbon against the paper with pins. They are slow and noisy, but they are the only type that can print on multipart (carbon-copy) forms, which is why they survive in warehouses and logistics. Maintenance: replace the ribbon, printhead, and paper.
Choosing the right printer
The exam often asks which printer type fits a scenario. A busy office printing mostly text needs a laser printer. A photographer printing colour photos needs an inkjet. A shop printing receipts needs a thermal printer. A warehouse printing multi-part delivery forms needs an impact printer. When a question mentions a symptom — faded prints, lines down the page, paper jams — the answer usually depends on the printer type, which is why the troubleshooting guide revisits these symptoms in detail.
Printer consumables and total cost
Choosing a printer is not only about the purchase price: the exam expects you to think about the total cost of ownership. Inkjet printers are cheap to buy but expensive to run, because ink cartridges hold little ink and cost a lot per page — a home user printing a few pages a month may never notice, but an office printing hundreds of pages a week will spend far more on ink than the printer cost. Laser printers cost more up front but far less per page, because a toner cartridge prints thousands of pages, and the cost per page drops further with high-yield cartridges. Thermal printers have no ink or toner at all, but the special thermal paper costs more than ordinary paper and the printed output fades over time, so thermal is wrong for documents that must be kept. Impact printers are cheap to run (ribbons are inexpensive) but slow, noisy, and limited in quality. When a scenario gives you a print volume and a budget, work out the cost per page first — it is usually the deciding factor. Also remember that consumables are specific to each model: a toner cartridge for one laser printer will not fit another, so part numbers matter when ordering replacements.
Printer sharing and network configuration
A networked printer needs an IP address, just like any other network device. In a small office the printer usually gets its address from DHCP, but that can cause a problem: if the printer's address changes, every computer that prints to it by IP address loses the connection. The fix is a DHCP reservation for the printer's MAC address, or a static IP address outside the DHCP pool — the same technique used for servers. Wireless printers can also use Wi-Fi Direct, which lets a phone or laptop print directly to the printer without joining a network, useful for guests. When a printer is shared from a print server, the server holds the drivers and the queue; client computers download the driver from the server when they first connect, which is why driver management on the server matters so much. If a user cannot print, the support sequence is the same as for any network device: check the physical connection and power, check the printer has paper and consumables, check the queue for stuck jobs, and check the driver on the client.
Exam traps to watch for
- Recommending an inkjet for a busy office: lasers are faster with a lower cost per page for high-volume text printing. Inkjet is for photos and low volume.
- Forgetting that only impact (dot-matrix) printers can print multipart carbon-copy forms — no other type can.
- Cleaning a laser printer with a regular vacuum: toner particles are so fine they pass through normal filters, so a toner-rated vacuum is required.
- Mixing up PCL and PostScript: PCL is the general office standard (HP), PostScript is for graphics and desktop publishing (Adobe).
Practice questions
Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.
Q1.A warehouse needs to print delivery notes on three-part carbon-copy paper. Which printer type should be used?
Explanation: Impact printers strike pins through an inked ribbon onto the paper, and the physical force transfers the image through all layers of a multipart form — no other printer type can do this. Option A is wrong because a laser printer fuses toner onto the top sheet only; it cannot mark the copies underneath. Option B is wrong because inkjet sprays ink onto the surface of the top sheet only. Option D is wrong because thermal printers use heat on special paper and cannot produce carbon copies.
Exam objective: 220-1201 Objective 3.8: Given a scenario, perform appropriate printer maintenance
Q2.A retail shop needs a printer for receipts at the till. The printer must be cheap to run, have no ink or toner to replace, and print quickly. Which type fits best?
Explanation: Thermal printers use heat on special thermal paper, so there is no ink or toner to buy, and they print receipts quickly and quietly — the standard choice for point-of-sale. Option C is wrong because laser printers are too large, slow to warm up, and expensive for receipt printing. Option D is wrong because inkjet is slow and has a high cost per page. Option A is wrong because impact printers are noisy and slow, suited to multipart forms rather than receipts.
Exam objective: 220-1201 Objective 3.8: Given a scenario, perform appropriate printer maintenance
Q3.A laser printer has printed 200,000 pages and now produces faded output with lines down the page, even with a new toner cartridge. What maintenance should be performed?
Explanation: At high page counts, laser printer wear items — the fuser, rollers, and separation pads — degrade and cause faded output and lines. The manufacturer's maintenance kit replaces them. Option C is wrong because printhead cleaning is an inkjet procedure; laser printers have no printheads. Option D is wrong because ribbons belong to impact printers. Option A is wrong because a driver change affects how jobs are rendered, not the physical quality of faded, lined output with a new toner cartridge.
Exam objective: 220-1201 Objective 3.8: Given a scenario, perform appropriate printer maintenance
Q4.A law firm wants to stop confidential documents from sitting in the printer output tray where anyone can pick them up. Which feature should be enabled?
Explanation: Secured (or pull) printing holds jobs on the printer until the user authenticates at the device — by PIN, badge, or login — so confidential pages are only printed when the owner is standing at the printer. Option B is wrong because duplex is double-sided printing, unrelated to confidentiality. Option C is wrong because a print server centralizes queuing and drivers but does not hold jobs for authentication. Option D is wrong because an ADF is a scanning feature for multi-page documents.
Exam objective: 220-1201 Objective 3.7: Given a scenario, deploy and configure multifunction devices/printers and settings
Q5.A graphic design studio prints high-quality colour artwork and brochures. Which printer driver language is the best choice?
Explanation: PostScript was developed by Adobe for graphics and desktop publishing and renders complex artwork, fonts, and colour more precisely than PCL. Option A is wrong because PCL is designed for general office text printing, not graphics-heavy work. Option B is wrong because thermal is a printer type, not a driver language. Option D is wrong because ESC/P is an old Epson printer control language, not a modern graphics standard.
Exam objective: 220-1201 Objective 3.7: Given a scenario, deploy and configure multifunction devices/printers and settings
Q6.An office with 40 users wants to share one printer efficiently, with centralized driver management and a single print queue. What is the best setup?
Explanation: A print server hosts the printer on the network, provides a single managed queue, and centralizes driver distribution — the correct setup for a 40-user office. Option A is wrong because sharing from a user's PC means printing stops when that PC is off or rebooted, and it loads that PC with print jobs. Option B is wrong because Wi-Fi Direct is a one-to-one connection, not a managed shared service. Option D is wrong because it is impractical (one printer cannot have 40 USB cables) and provides no sharing at all.
Exam objective: 220-1201 Objective 3.7: Given a scenario, deploy and configure multifunction devices/printers and settings
Q7.A user needs to scan a fragile, bound book. Which scanning method should be used?
Explanation: A flatbed scanner lets the user place the book on the glass and scan one page at a time without bending or feeding it — the only safe option for bound or fragile originals. Option B is wrong because an ADF feeds pages through rollers, which would damage a bound book and cannot handle pages that are not loose sheets. Option D is wrong because scan-to-email is a destination, not a scanning method. Option C is wrong because there is no such thing as a thermal scanner in this context.
Exam objective: 220-1201 Objective 3.7: Given a scenario, deploy and configure multifunction devices/printers and settings
Q8.An inkjet printer produces output with missing lines and streaks. The cartridges are full. What is the most likely cause and the correct first maintenance step?
Explanation: Missing lines and streaks on an inkjet with full cartridges usually mean clogged printhead nozzles, and the built-in cleaning cycle is designed to clear them. Option B is wrong because fusers belong to laser printers, not inkjets. Option A is wrong because ribbons belong to impact printers. Option C is wrong because thermal paper is used by thermal printers, not inkjets.
Exam objective: 220-1201 Objective 3.8: Given a scenario, perform appropriate printer maintenance