A+ Core 2 220-1202 Mock Test
50 timed questions · 50 minutes · scored by domain, with re-study links for your weakest areas.
How it works: the timer starts as soon as this page loads. Answer each question, use the numbered dots to jump around, and flag questions to come back to. You see no feedback until you submit — just like the real exam. The pass guide is 70%: note that some vendors (including AWS) use scaled scoring and do not publish a percentage pass mark, so 70% is a study guide only.
Q1.A technician needs to check which version of Windows is installed and its build number. Which command shows the Windows version information?
Explanation: winver displays the Windows edition, version, and OS build. (To check whether the OS is 32-bit or 64-bit, use Settings → System → About → System type, or systeminfo.) Option B is wrong because whoami shows the current user account. Option D is wrong because hostname shows the computer name. Option C is wrong because net user manages user accounts.
Exam objective: 220-1202 Objective 1.5: Given a scenario, use the appropriate Microsoft command-line tools
Q2.A Linux user wants to display the contents of a text file in the terminal. Which command should be used?
Explanation: cat displays the contents of a file in the terminal. Option B is wrong because chmod changes file permissions. Option C is wrong because mount attaches a filesystem. Option D is wrong because grep searches for text patterns within files — it can show matching lines but is not the command for displaying a whole file.
Exam objective: 220-1202 Objective 1.9: Identify common features and tools of the Linux client/desktop operating system
Q3.A technician is setting up a new Windows PC and needs to create a second partition on the drive for data storage. Which tool should be used?
Explanation: Disk Management is the tool for creating, resizing, formatting, and deleting partitions and assigning drive letters. Option D is wrong because Event Viewer shows logs. Option B is wrong because Task Scheduler runs programs on a schedule. Option A is wrong because Registry Editor edits the Windows registry, not disk partitions.
Exam objective: 220-1202 Objective 1.4: Given a scenario, use Microsoft Windows operating system features and tools
Q4.A user wants their files to be available on their laptop, phone, and tablet, with changes syncing automatically between all devices. Which cloud feature provides this?
Explanation: Cloud storage services (OneDrive, Google Drive, Dropbox) synchronize files across devices, so a change on one device appears on all of them. Option A is wrong because identity synchronization keeps user accounts consistent between directories, not files. Option C is wrong because licensing assignment controls who can use a service. Option B is wrong because a VPN provides a secure network connection, not file sync.
Exam objective: 220-1202 Objective 1.11: Given a scenario, install and configure cloud-based productivity tools
Q5.A company wants to prevent sensitive customer data from being emailed outside the organization. Which security control is designed for this?
Explanation: Data loss prevention (DLP) monitors and blocks the unauthorized transfer of sensitive data — including emailing customer records outside the organization. Option C is wrong because a bollard is a physical vehicle barrier. Option D is wrong because a UPS provides backup power. Option A is wrong because Disk Cleanup removes temporary files.
Exam objective: 220-1202 Objective 2.1: Summarize various security measures and their purposes
Q6.An attacker calls an employee, pretends to be from the IT help desk, and asks for the employee's password to "fix an urgent problem." What type of attack is this?
Explanation: Vishing (voice phishing) is a social engineering attack conducted by phone call, in which the attacker impersonates a trusted party to extract credentials or information. Option D is wrong because phishing generally refers to email-based attacks (vishing is the voice variant). Option B is wrong because smishing uses SMS text messages, not voice calls. Option A is wrong because a brute-force attack tries many passwords automatically.
Exam objective: 220-1202 Objective 2.5: Compare and contrast common social engineering attacks, threats, and vulnerabilities
Q7.A technician finds a USB flash drive labelled "Payroll Data" in the office car park. What is the safest action?
Explanation: Unknown USB drives are a classic malware delivery method (and may also contain sensitive data). The safe action is to hand it to IT security without plugging it into any computer. Option A is wrong because plugging it in risks infecting the work computer. Option B is wrong because it risks infecting a personal computer and mishandles potentially sensitive company data. Option C is wrong because the drive may contain important company data that should be returned to its owner through IT security.
Exam objective: 220-1202 Objective 2.7: Given a scenario, apply workstation security options and hardening techniques
Q8.A home user has just installed a new Wi-Fi router. Which is the most important first security step?
Explanation: Default router passwords are publicly known, so changing the admin password is the most important first step, along with updating the firmware to patch known vulnerabilities. Option D is wrong because disabling the firewall removes a key protection. Option A is wrong because the default SSID reveals the router model to attackers. Option B is wrong because WEP is thoroughly broken; WPA2 or WPA3 should be used.
Exam objective: 220-1202 Objective 2.10: Given a scenario, apply security settings on SOHO wireless and wired networks
Q9.A user's computer is running very slowly and the CPU is constantly at 100%, but no application appears to be using it. A scan finds no files on disk associated with the problem. What type of malware is most likely involved?
Explanation: Fileless malware executes in memory (often using legitimate system tools such as PowerShell) without writing files to disk, which is why no suspicious files are found and why it consumes CPU invisibly. Option B is wrong because a boot sector virus infects the boot sector on disk and would be detectable there. Option D is wrong because adware displays ads, which are not reported here. Option C is wrong because a Trojan is a malicious program file, which would be found on disk.
Exam objective: 220-1202 Objective 2.4: Summarize types of malware and tools/methods for detection, removal, and prevention
Q10.A company needs to dispose of old SSDs that held sensitive data. Which method is appropriate, given that degaussing does not work on SSDs?
Explanation: Degaussing uses magnets and only works on magnetic media (HDDs); SSDs store data in flash memory chips that magnets do not affect. SSDs must be destroyed physically (shredding, incineration) or wiped with a secure-erase method designed for flash storage. Option B is wrong because degaussing does not work on SSDs. Option C is wrong because standard formatting only removes the file table and the data remains recoverable. Option A is wrong because indefinite storage is not a disposal method and the data remains at risk.
Exam objective: 220-1202 Objective 2.9: Compare and contrast common data destruction and disposal methods
Q11.A Windows PC shows a "Low memory" warning when the user opens several applications. The PC has 4 GB of RAM. What is the best solution?
Explanation: Low memory warnings mean the system is running out of RAM. Closing unused applications frees memory immediately, and adding more RAM is the lasting fix; increasing the page file helps in the short term (at the cost of speed, since disk is slower than RAM). Option C is wrong because disabling the page file removes the overflow space and makes low-memory problems worse. Option B is wrong because defragmenting affects disk layout, not memory. Option D is wrong because deleting files frees disk space, not RAM.
Exam objective: 220-1202 Objective 3.1: Given a scenario, troubleshoot common Windows OS issues
Q12.A user's phone keeps rebooting randomly several times a day. The phone is three years old and the battery drains quickly. What is the most likely cause?
Explanation: Random reboots combined with rapid battery drain on an older phone most commonly indicate a failing battery that can no longer deliver stable voltage under load. Option D is wrong because Wi-Fi settings do not cause reboots. Option A is wrong because contacts use negligible resources. Option B is wrong because brightness affects battery life but does not cause reboots.
Exam objective: 220-1202 Objective 3.2: Given a scenario, troubleshoot common mobile OS and application issues
Q13.A user reports that their browser home page has changed to an unfamiliar search site and they cannot change it back. What is the most likely cause?
Explanation: A home page that changes by itself and cannot be changed back is a classic symptom of a browser hijacker — usually a malicious extension or malware that has modified the browser's settings. Option C is wrong because browser updates do not change the home page to an unfamiliar site. Option A is wrong because connection speed does not affect browser settings. Option D is wrong because an incorrect clock causes certificate errors, not home page changes.
Exam objective: 220-1202 Objective 3.4: Given a scenario, troubleshoot common personal computer (PC) security issues
Q14.A new support technician takes a call from a user whose computer will not start. What information should be recorded in the ticket FIRST?
Explanation: A good ticket starts with who reported the issue, which device is affected, and a clear description of the problem — this is the information needed to diagnose and track the issue. Option A is wrong because opinions and theories belong in progress notes after investigation, not as the first record. Option C is wrong because cost is determined later, if at all. Option B is irrelevant.
Exam objective: 220-1202 Objective 4.1: Given a scenario, implement best practices associated with documentation and support systems information management
Q15.An IT department needs to test a major software update before deploying it to all users. Where should the update be tested first?
Explanation: Sandbox testing means trying the change in an isolated environment that mirrors production, so problems are found before they affect real users. Option A is wrong because testing on production systems during business hours risks an outage. Option B is wrong because one laptop is not a representative test environment. Option D is wrong because deploying untested changes to users without their knowledge is unprofessional and risky.
Exam objective: 220-1202 Objective 4.2: Given a scenario, apply change management procedures
Q16.A company has a service-level agreement (SLA) promising that critical support tickets will receive a first response within 30 minutes. A critical ticket has been open for 45 minutes with no response. What has happened?
Explanation: An SLA is a commitment: a critical ticket with no response after 45 minutes has missed the 30-minute target, so the SLA is breached and the ticket should be escalated to ensure it gets attention. Option B is wrong because SLAs are formal agreements, not optional guidelines. Option C is wrong because closing and reopening a ticket to hide a breach is dishonest and does not help the user. Option D is wrong because it puts the burden on the user instead of fixing the problem.
Exam objective: 220-1202 Objective 4.1: Given a scenario, implement best practices associated with documentation and support systems information management
Q17.A technician is cleaning dust from inside a desktop computer. Which tool is safe to use?
Explanation: Compressed air is the standard tool for cleaning dust from inside a PC; short bursts prevent moisture buildup, and holding fans still prevents them from spinning (which can generate voltage or damage bearings). Option C is wrong because moisture on a motherboard can cause short circuits. Option A is wrong because a household vacuum generates static electricity that can damage components. Option D is wrong because a wet sponge would introduce water into the system.
Exam objective: 220-1202 Objective 4.5: Summarize environmental impacts and local environment controls
Q18.A support technician needs to help a remote user by viewing and controlling their screen. The user is on a Windows PC and the technician is in the same office network. Which tool is the standard choice?
Explanation: RDP is Microsoft's protocol for remote graphical access to a Windows desktop, letting the technician see and control the user's screen. Option D is wrong because SSH provides a command-line session, not a graphical desktop. Option B is wrong because FTP transfers files; it does not provide remote control. Option A is wrong because Telnet is unencrypted and provides only a command line.
Exam objective: 220-1202 Objective 4.9: Given a scenario, use remote access technologies
Q19.An employee wants to use a public AI chatbot to summarize a confidential company report. What is the main risk?
Explanation: Public AI services may retain user input and use it for training, so pasting confidential company data into one can leak sensitive information and violate data privacy policies. Confidential data should only be processed by approved, private AI tools. Option A is wrong because speed is not the concern. Option D is wrong because many AI tools can read PDFs. Option B is wrong because cost is not the main risk.
Exam objective: 220-1202 Objective 4.10: Explain basic concepts related to artificial intelligence (AI)
Q20.A user asks a support technician to install a paid application using a licence key the user found on a file-sharing website. What should the technician do?
Explanation: A licence key from a file-sharing site is not a valid licence. Installing software with it violates the end-user licence agreement (EULA) and software licensing law, and exposes the organization to legal and security risk. Option C is wrong because the user providing the key does not make it legitimate. Option D is wrong because hiding the installation compounds the violation. Option A is wrong because installing different software without the user's knowledge is not the right response — the technician should explain the licensing issue and offer legitimate options.
Exam objective: 220-1202 Objective 4.6: Explain the importance of prohibited content/activity and privacy, licensing, and policy concepts
Q21.A user needs to copy a single 8 GB video file onto a USB flash drive that will be used on both Windows and macOS computers. The drive is currently formatted as FAT32. What should the technician do?
Explanation: FAT32 cannot store a file larger than 4 GB, so the 8 GB video would fail to copy. exFAT removes that limit and is readable and writable on both Windows and macOS, making it the right choice for a shared drive. Option A is wrong because the copy would fail at 4 GB. Option D is wrong because macOS can read NTFS but cannot write to it without third-party software. Option C is wrong because exFAT and NTFS both support files far larger than 8 GB.
Exam objective: 220-1202 Objective 1.1: Explain common operating system (OS) types and their purposes
Q22.A small business wants to join its Windows computers to a domain so it can manage them centrally with Group Policy. The computers currently run Windows 11 Home. What is required?
Explanation: Windows Home cannot join an Active Directory domain and does not include the Group Policy Editor (gpedit.msc); both features require Pro or a higher edition. Option C is wrong because domain join is a Pro-and-above feature. Option B is wrong because Group Policy Editor is not available as a Store download for Home — it is an edition feature. Option D is wrong because a workgroup is the opposite of central management; it provides no Group Policy at all.
Exam objective: 220-1202 Objective 1.3: Compare and contrast basic features of Microsoft Windows editions
Q23.An IT department needs to deploy the same Windows image, with all standard applications pre-installed, to 100 new computers. Which deployment method is most efficient?
Explanation: Image deployment applies a single pre-configured disk image — OS plus applications and settings — to many machines at once, which is far faster and more consistent than manual installation. Option D is wrong because manual installation on 100 machines would take days and produce inconsistent results. Option A is wrong for the same reason: it repeats the same work 100 times. Option B is wrong because a recovery partition restores a machine to its factory state; it does not deploy a custom corporate image.
Exam objective: 220-1202 Objective 1.2: Given a scenario, perform OS installations and upgrades in a diverse environment
Q24.Which Windows 11 feature requires a TPM 2.0 chip and is NOT available in the Home edition?
Explanation: BitLocker is full-disk encryption that uses the TPM to store encryption keys, and it is available only in Windows Pro and higher editions — not Home. Option B is wrong because Windows Hello is available in Home edition. Option C is wrong because Edge is included in all editions. Option D is wrong because Defender Antivirus is included in all editions.
Exam objective: 220-1202 Objective 1.3: Compare and contrast basic features of Microsoft Windows editions
Q25.A user's computer is very slow. Task Manager shows one process using 95% of the CPU continuously. What is the best first step?
Explanation: A single process consuming 95% of the CPU is the immediate cause of the slowness, so ending it in Task Manager restores performance, and investigating the cause (a runaway application, a stuck update, or malware) prevents recurrence. Option A is wrong because reinstalling Windows is a drastic step for a single misbehaving process. Option C is wrong because defragmenting affects disk layout, not CPU usage. Option B is wrong because the bottleneck is CPU, not memory.
Exam objective: 220-1202 Objective 1.4: Given a scenario, use Microsoft Windows operating system features and tools
Q26.A user cannot reach a website by name, but the website works for everyone else. The technician suspects a stale DNS entry on the user's computer. Which command clears the DNS resolver cache?
Explanation: ipconfig /flushdns clears the local DNS resolver cache, forcing the computer to look up the name fresh — the correct fix for a stale or poisoned cache entry. Option C is wrong because /release drops the current DHCP-assigned IP address. Option B is wrong because /renew requests a new IP address from DHCP. Option A is wrong because netstat shows active connections, not DNS cache contents.
Exam objective: 220-1202 Objective 1.5: Given a scenario, use the appropriate Microsoft command-line tools
Q27.A technician needs to copy a large folder structure from one server to another, preserving permissions and resuming if the copy is interrupted. Which command is best suited to this?
Explanation: robocopy (Robust File Copy) is designed for large, reliable copies: it can resume interrupted transfers, mirror directory trees, and preserve file attributes and permissions. Option D is wrong because dir only lists directory contents. Option C is wrong because ping tests connectivity; it does not copy files. Option A is wrong because md only creates directories.
Exam objective: 220-1202 Objective 1.5: Given a scenario, use the appropriate Microsoft command-line tools
Q28.A Linux user needs to find which process is using the most CPU right now, with a live updating display. Which command should be used?
Explanation: top displays a live, continuously updating table of processes sorted by CPU (or memory) usage, making it the right tool for spotting a runaway process. Option B is wrong because ls lists files in a directory, not processes. Option C is wrong because cat displays file contents. Option A is wrong because df shows free disk space, not CPU usage.
Exam objective: 220-1202 Objective 1.9: Identify common features and tools of the Linux client/desktop operating system
Q29.A Linux administrator needs to install a software update on an Ubuntu system. Which package manager should be used?
Explanation: Ubuntu is based on Debian and uses apt for package management. Option A is wrong because dnf is used by Fedora and RHEL-based distributions, not Ubuntu. Option B is wrong because yum is the older predecessor of dnf on RHEL-based systems, not Ubuntu's tool. Option D is wrong because rpm is the package manager for RHEL-based distributions, not Ubuntu's.
Exam objective: 220-1202 Objective 1.9: Identify common features and tools of the Linux client/desktop operating system
Q30.A macOS user wants to encrypt their entire hard drive so that the data is unreadable if the laptop is stolen. Which macOS feature provides this?
Explanation: FileVault is macOS's full-disk encryption feature; it encrypts the entire drive so the data is unreadable without the password or recovery key. Option A is wrong because Time Machine is a backup tool, not encryption. Option C is wrong because Spotlight is a search feature. Option D is wrong because Keychain is a password manager, not disk encryption.
Exam objective: 220-1202 Objective 1.8: Explain common features and tools of the macOS/desktop operating system
Q31.A company wants to ensure that employees can only access the files they need for their jobs, and nothing else. Which security principle should be applied?
Explanation: The principle of least privilege means giving each user only the permissions they need to do their job — nothing more. Option C is wrong because Zero Trust is a broader architecture (verify every request, trust nothing by default), not the specific principle of minimal permissions. Option B is wrong because MFA is about how users authenticate, not what they can access afterwards. Option D is wrong because DLP prevents sensitive data from leaving the organization; it does not define access permissions.
Exam objective: 220-1202 Objective 2.1: Summarize various security measures and their purposes
Q32.A company has a room containing servers. It wants a physical control that ensures only one person can enter at a time, so an unauthorized person cannot slip in behind an authorized employee. What should be installed?
Explanation: An access control vestibule (mantrap) is a small room with two doors, only one of which opens at a time, so only one person passes through — preventing tailgating. Option A is wrong because a bollard stops vehicles, not people. Option C is wrong because a magnetometer detects metal objects; it does not control how many people enter. Option B is wrong because a camera records activity but does not physically prevent tailgating.
Exam objective: 220-1202 Objective 2.1: Summarize various security measures and their purposes
Q33.A laptop containing sensitive company data was stolen from a car. The IT department wants to ensure the data cannot be read from the drive. Which Windows feature would have protected the data?
Explanation: BitLocker encrypts the entire drive, so a stolen laptop's data is unreadable without the encryption key or recovery password. Option D is wrong because EFS encrypts only selected files and folders — other data on the drive (including temporary files and the page file) would still be readable. Option A is wrong because the firewall controls network traffic; it does not protect data on a stolen drive. Option C is wrong because UAC controls whether programs can make system changes; it does not encrypt data.
Exam objective: 220-1202 Objective 2.2: Given a scenario, configure and apply basic Microsoft Windows OS security settings
Q34.A large company wants each employee to have their own Wi-Fi login credentials, so that access can be revoked for one person without changing a shared password. Which authentication approach should be used?
Explanation: WPA2-Enterprise uses a RADIUS server to authenticate each user individually, so credentials can be issued and revoked per person — exactly what the company needs. Option A is wrong because WPA2-Personal uses one shared password for everyone; changing it affects all users. Option D is wrong because a captive portal is a web login page, not per-user Wi-Fi authentication. Option B is wrong because WEP is insecure and also uses a shared key.
Exam objective: 220-1202 Objective 2.3: Compare and contrast wireless security protocols and authentication methods
Q35.A user's files have been encrypted and a message demands payment in cryptocurrency for the decryption key. What type of malware is this?
Explanation: Ransomware encrypts the victim's files and demands payment (usually in cryptocurrency) for the decryption key. Option A is wrong because spyware secretly collects information without encrypting files. Option D is wrong because adware displays unwanted advertisements. Option C is wrong because a keylogger records keystrokes to steal credentials.
Exam objective: 220-1202 Objective 2.4: Summarize types of malware and tools/methods for detection, removal, and prevention
Q36.An employee receives an email that appears to be from the CEO, urgently asking them to transfer money to a new supplier account. The email address is slightly different from the CEO's real address. What type of attack is this?
Explanation: Business email compromise (BEC) involves impersonating an executive (often with a lookalike email address) to trick an employee into transferring money or revealing sensitive information. Option D is wrong because a DoS attack overwhelms a service with traffic. Option B is wrong because a brute-force attack tries many passwords against an account. Option A is wrong because an evil twin is a fake wireless access point.
Exam objective: 220-1202 Objective 2.5: Compare and contrast common social engineering attacks, threats, and vulnerabilities
Q37.A company is disposing of old hard drives that contained customer financial data. Which destruction method guarantees the data cannot be recovered?
Explanation: For highly sensitive data, physical destruction (shredding, drilling, incineration) or degaussing (for magnetic HDDs) is the reliable method, and a certification of destruction provides an auditable record. Option C is wrong because standard formatting only removes the file table — the data remains recoverable with forensic tools. Option B is wrong because deleting files only marks the space as available; the data is still on the disk. Option A is wrong because moving files does not destroy them.
Exam objective: 220-1202 Objective 2.9: Compare and contrast common data destruction and disposal methods
Q38.An employee's company phone is stolen. The IT department needs to protect the company data on the phone. What should be done?
Explanation: A remote wipe, issued through the mobile device management (MDM) solution, erases the company data (and usually the entire device) so the thief cannot access it. Option D is wrong because changing the email password does not remove data already stored on the phone. Option C is wrong because it does nothing to protect the data. Option B is wrong because cancelling the contract stops the cellular service but leaves the data on the device.
Exam objective: 220-1202 Objective 2.8: Given a scenario, apply common methods for securing mobile devices
Q39.A Windows PC shows a blue screen of death (BSOD) with a stop code shortly after a new graphics driver was installed. What is the most likely cause and the best first step?
Explanation: A BSOD appearing right after a driver installation strongly suggests the driver is the cause. Booting into Safe Mode (which loads only basic drivers) and rolling back or uninstalling the driver is the standard fix. Option C is wrong because a failing drive would cause data errors, not a BSOD timed to a driver install. Option D is wrong because desktop files do not cause BSODs. Option A is wrong because insufficient RAM causes slowness and low-memory warnings, not a BSOD after a driver change.
Exam objective: 220-1202 Objective 3.1: Given a scenario, troubleshoot common Windows OS issues
Q40.A Windows computer has become very slow over several weeks. Task Manager shows the disk at 100% utilization, and the drive is nearly full. What is the best first step?
Explanation: A nearly full drive causes degraded performance (Windows needs free space for the page file and temporary files), and 100% disk utilization confirms the disk is the bottleneck. Freeing space and identifying the process using the disk is the right first step; an SSD upgrade addresses the underlying speed problem. Option A is wrong because the CPU is not the bottleneck — disk utilization is. Option C is wrong because the firewall is unrelated to disk performance. Option D is wrong because printer drivers do not affect disk utilization.
Exam objective: 220-1202 Objective 3.1: Given a scenario, troubleshoot common Windows OS issues
Q41.A user reports that a Windows service their application depends on is not running. Where should the technician check the service's status and startup type?
Explanation: The Services console (services.msc) shows every service, its status (running or stopped), and its startup type (Automatic, Manual, Disabled), and lets the technician start it or change its startup type. Task Manager's Services tab shows the same information. Option A is wrong because the Recycle Bin holds deleted files. Option D is wrong because Device Manager shows hardware devices, not services. Option C is wrong because Sound settings are unrelated to services.
Exam objective: 220-1202 Objective 3.1: Given a scenario, troubleshoot common Windows OS issues
Q42.A user cannot install a new application on their phone. The phone shows a "not enough storage" message, but the user insists they have space. What should the technician check?
Explanation: The "not enough storage" message means the phone does not have enough free space for the installation, regardless of what the user believes. Checking the actual available storage in Settings — and clearing cached data or removing unused apps — is the correct step. Option D is wrong because Bluetooth is unrelated to storage. Option A is wrong because brightness affects battery, not storage. Option B is wrong because email configuration does not affect app installation storage.
Exam objective: 220-1202 Objective 3.2: Given a scenario, troubleshoot common mobile OS and application issues
Q43.A user's phone shows constant pop-up advertisements, uses far more mobile data than usual, and responds very slowly. The user recently installed a free game from a website rather than the official app store. What is the most likely cause?
Explanation: Excessive ads, high data usage, and degraded performance appearing after installing an app from outside the official store are the classic symptoms of adware or malware from an unofficial source. Option A is wrong because a degraded battery causes short battery life, not ads or data spikes. Option C is wrong because a missing update does not cause these symptoms. Option B is wrong because stored photos affect storage space, not ads or data usage.
Exam objective: 220-1202 Objective 3.3: Given a scenario, troubleshoot common mobile OS and application security issues
Q44.A company's mobile device policy prohibits jailbroken or rooted phones from accessing corporate email. Why?
Explanation: Rooting (Android) or jailbreaking (iOS) removes the operating system's built-in security restrictions, giving any app — including malware — full access to the device. A rooted device cannot be trusted to enforce the security policies that protect corporate data. Option C is wrong because jailbroken phones connect to Wi-Fi normally. Option D is wrong because battery usage is not the concern. Option B is wrong because email apps generally run on rooted phones — the problem is trust, not compatibility.
Exam objective: 220-1202 Objective 3.3: Given a scenario, troubleshoot common mobile OS and application security issues
Q45.A user's web browser keeps redirecting to unfamiliar shopping sites, and new toolbars have appeared that the user did not install. What is the most likely cause?
Explanation: Unexpected redirection combined with unfamiliar toolbars is the classic signature of a browser hijacker — usually a malicious extension installed alongside free software. The fix is to remove suspicious extensions, reset the browser settings, and run a malware scan. Option B is wrong because a slow connection causes slow loading, not redirection or new toolbars. Option D is wrong because an outdated browser does not install toolbars by itself. Option C is wrong because a DNS misconfiguration would break name resolution broadly, not add toolbars.
Exam objective: 220-1202 Objective 3.4: Given a scenario, troubleshoot common personal computer (PC) security issues
Q46.After removing malware from a user's computer, the technician advises the user to change their passwords. Why should the password change be done from a different, clean device?
Explanation: If any malware remains on the computer — particularly a keylogger — it could capture the new passwords as they are typed. Changing passwords from a known-clean device avoids this risk. Option C is wrong because keyboard function is not the issue. Option D is wrong because password changes need very little bandwidth. Option A is wrong because the account is not necessarily locked.
Exam objective: 220-1202 Objective 3.4: Given a scenario, troubleshoot common personal computer (PC) security issues
Q47.A technician is about to replace a motherboard. Which safety equipment should be used to protect the components from electrostatic discharge?
Explanation: ESD straps and mats ground the technician and the work surface, preventing static charges from damaging sensitive components, and antistatic bags protect parts in storage. Option B is wrong because goggles and masks protect the technician from debris and dust, not components from static. Option D is wrong because a surge suppressor protects against power spikes, not electrostatic discharge. Option C is wrong because insulated gloves alone do not ground the technician.
Exam objective: 220-1202 Objective 4.4: Given a scenario, use common safety procedures
Q48.An IT department follows the 3-2-1 backup rule. What does it require?
Explanation: The 3-2-1 rule is: three copies of the data, stored on two different types of media, with one copy kept offsite — so no single disaster (fire, theft, ransomware) can destroy all copies. The other options invent meanings that do not match the rule.
Exam objective: 220-1202 Objective 4.3: Given a scenario, implement workstation backup and recovery methods
Q49.A technician discovers prohibited content on a user's work computer. What is the correct FIRST action?
Explanation: Prohibited content must be treated as evidence: document the discovery, preserve a copy of the drive, maintain a chain of custody (recording who handled the evidence), and escalate to management or law enforcement as the organization's policy requires. Option B is wrong because deleting the content destroys evidence. Option D is wrong because confronting the user is a management or HR responsibility, not the technician's. Option C is wrong because copying prohibited content and sharing it is itself a policy violation and potentially a criminal act.
Exam objective: 220-1202 Objective 4.6: Explain the importance of prohibited content/activity and privacy, licensing, and policy concepts
Q50.A technician needs to automate a weekly task: restarting a set of computers and remapping a network drive on each one. Which approach is most appropriate?
Explanation: Scripting is designed for exactly this kind of repetitive task: a batch (.bat) or PowerShell (.ps1) script can restart machines and remap network drives automatically and consistently. Option B is wrong because manual repetition wastes time and introduces errors. Option D is wrong because relying on users is unreliable and unprofessional. Option C is wrong because disabling the drive removes a service users need.
Exam objective: 220-1202 Objective 4.8: Explain the basics of scripting