macOS, Linux, Applications & Cloud Tools

A+ Core 2 220-1202 · Operating Systems

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

Windows dominates the Operating Systems domain, but Core 2 also tests macOS, Linux, application installation, and cloud-based productivity tools. These four objectives are worth learning well: they are compact, factual, and very learnable, and candidates who know the Linux command list and the macOS feature names pick up easy marks.

macOS features and tools

macOS applications come in several forms. .dmg files are disk images — you open one and drag the application into the Applications folder. .pkg files are installer packages that run a guided installation. .app files are the applications themselves (actually folders containing the program and its resources). Applications can also be installed from the App Store. Uninstallation is usually as simple as dragging the .app to the Trash, although some applications include their own uninstaller.

The macOS folder structure is Unix-based: /Applications holds installed apps, /Users holds user home folders, /Library holds system-wide settings and support files, /System holds the OS itself, and /Users/Library holds per-user settings and caches (hidden by default). System Preferences (called System Settings in newer macOS versions) covers Displays, Networks, Printers, Scanners, Privacy, Accessibility, and Time Machine. Time Machine is macOS's built-in backup tool. Disk Utility manages disks and partitions. FileVault is full-disk encryption. Terminal provides command-line access. Force Quit closes unresponsive applications.

macOS features the exam lists include multiple desktops (Spaces), Mission Control (an overview of all open windows), Spotlight (system-wide search), iCloud (cloud sync for files, photos, and settings, including iMessage, FaceTime, and Drive), Keychain (the password manager), Finder (the file manager), the Dock (the application launcher bar), Gestures (trackpad shortcuts), and Continuity (features that let a Mac and an iPhone work together, such as Handoff and AirDrop). Best practices include keeping the system updated (including Rapid Security Responses, Apple's fast security patches), using antivirus software, and managing Apple ID and corporate restrictions on managed devices.

Linux features and tools

Linux is tested through its command line, so learn the commands by category. File management: ls (list files), pwd (print working directory), mv (move/rename), cp (copy), rm (remove), chmod (change permissions), chown (change owner), grep (search text), find (find files). Filesystem management: fsck (check and repair a filesystem), mount (attach a filesystem). Administrative: su (switch user, usually to root), sudo (run a command as root). Package management: apt (Debian/Ubuntu) and dnf (Fedora/RHEL) install and update software. Network: ip (show/configure network interfaces), ping, curl (transfer data from a URL), dig (DNS lookup), traceroute. Informational: man (manual pages), cat (display file contents), top (live process and resource display), ps (list processes), du (disk usage), df (free disk space). Text editors: nano is the beginner-friendly editor the exam names.

Common configuration files are /etc/passwd (user account information), /etc/shadow (encrypted passwords, readable only by root), /etc/hosts (local hostname-to-IP mappings), /etc/fstab (filesystems to mount at boot), and /etc/resolv.conf (DNS server settings). OS components include the kernel (the core of the OS), systemd (the init system that manages services and boot), and the bootloader (which loads the kernel). The root account is the Linux superuser with unrestricted access — equivalent to Windows' Administrator — and best practice is to use sudo for individual commands rather than logging in as root.

Installing applications

Before installing an application, check the system requirements: CPU, RAM, storage, graphics (dedicated vs. integrated graphics card, VRAM requirements), and whether the application needs a 32-bit or 64-bit OS. Distribution methods include physical media, mountable ISO files, downloadable packages, and image deployment. Impact considerations for new applications cover the device (will it slow the computer down?), the network (will it consume bandwidth?), operations (does it need training or support?), and the business (does it meet a real need?). Application-to-OS compatibility matters: an application written for one OS version may not run on another, and the exam may ask about compatibility mode or virtualization as workarounds.

Cloud-based productivity tools

Modern office work runs on cloud tools, and the exam expects you to know how to install and configure them. Email systems (such as Microsoft 365 or Google Workspace) need sync and folder settings configured. Storage (OneDrive, Google Drive, Dropbox) needs sync settings and storage limits managed. Collaboration tools include word processing, spreadsheets, presentation tools, videoconferencing, and instant messaging — all cloud-hosted, all needing account setup. Identity synchronization keeps user accounts consistent between on-premises directories and cloud services (so a user has one login everywhere). Licensing assignment controls which users get access to which cloud services — a common support issue is a user who cannot open an application because no licence has been assigned to them.

Linux permissions and ownership in practice

Linux permissions are one of the most tested parts of this objective, so it is worth understanding them properly. Every file and directory has an owner, a group, and three sets of permissions: read (r), write (w), and execute (x) — one set for the owner, one for the group, and one for everyone else. The chmod command changes these permissions, either symbolically (chmod u+x file adds execute permission for the owner) or numerically (chmod 755 file sets read/write/execute for the owner and read/execute for group and others). The chown command changes who owns a file, which matters when a file created by one user needs to be used by another, or when a service needs access to a directory. A common support scenario is a user who cannot open a file they should be able to read — the fix is usually a chmod or chown correction, not a reinstall. Permissions also explain why Linux is resistant to malware: a program run by an ordinary user cannot modify system files, because the user does not have write permission on them — which is also why sudo exists, to grant temporary elevated rights for specific tasks.

Supporting a mixed-OS environment

Real offices rarely run a single operating system, and the exam reflects that. A support technician in a mixed environment needs to know the equivalent tool on each platform: Task Manager on Windows, Activity Monitor on macOS, top on Linux; Disk Management on Windows, Disk Utility on macOS, fdisk or df on Linux; BitLocker on Windows, FileVault on macOS, LUKS on Linux. File sharing between platforms works through common protocols — SMB for Windows shares, which macOS and Linux can both access — but filesystem compatibility is a recurring trap: a drive formatted as NTFS can be read by macOS but not written to, and a drive formatted as APFS cannot be read by Windows at all. When a user reports that a drive "works on one computer but not another," the filesystem is the first thing to check.

Advertisement

Exam traps to watch for

Practice questions

Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.

Q1.A Linux user needs to find which process is using the most CPU right now, with a live updating display. Which command should be used?

Report an error

Q2.A technician needs to change the permissions on a Linux file so that only the owner can read and write it. Which command should be used?

Report an error

Q3.A Linux administrator needs to install a software update on an Ubuntu system. Which package manager should be used?

Report an error

Q4.A macOS user has downloaded an application as a .dmg file. How is the application normally installed?

Report an error

Q5.A macOS user wants to encrypt their entire hard drive so that the data is unreadable if the laptop is stolen. Which macOS feature provides this?

Report an error

Q6.A new employee cannot open the company's cloud-based office applications, but can sign in to their email. Other new employees have no problem. What should the technician check first?

Report an error

Q7.A technician is installing a demanding video-editing application on a user's PC. Which system requirement is most important to check first?

Report an error

Q8.A Linux technician needs to look up the IP address of a domain name from the command line. Which command performs a DNS lookup?

Report an error