CISSP Glossary
Key terms and acronyms for the CISSP exam, explained in plain language.
- ABAC (Attribute-Based Access Control)
- An access control model that grants or denies access based on attributes of the user, the resource, and the environment (such as time or location).
- ALE (Annualized Loss Expectancy)
- The expected monetary loss per year from a risk: ALE = SLE × ARO. Used to justify the cost of security controls.
- ARO (Annualized Rate of Occurrence)
- The estimated number of times a loss event is expected to occur per year. A once-in-ten-years event has an ARO of 0.1.
- Bell-LaPadula model
- A confidentiality model with two rules: no read up (a subject cannot read a higher-level object) and no write down (a subject cannot write to a lower-level object).
- Biba model
- An integrity model with two rules: no read down (a subject cannot read a lower-integrity object) and no write up (a subject cannot write to a higher-integrity object).
- BIA (Business Impact Analysis)
- The process of identifying critical business functions, their dependencies, and the impact of their disruption; it produces the RTO, RPO and MTD.
- CAT (Computerized Adaptive Testing)
- An exam format in which the difficulty of each question adapts to the candidate’s previous answers; the CISSP uses CAT with 100–150 items in 3 hours.
- CER (Crossover Error Rate)
- The point at which a biometric system’s False Acceptance Rate equals its False Rejection Rate; the standard measure for comparing biometric systems. Lower is more accurate.
- Chain of custody
- The documented record of who handled a piece of evidence, when, and what they did with it. An unbroken chain is required for evidence to be admissible in court.
- Clark-Wilson model
- An integrity model for commercial systems based on well-formed transactions and separation of duties: data can only be changed through authorised procedures.
- CPE (Continuing Professional Education)
- Credits earned through professional development activities to maintain an (ISC)² certification; CISSP requires 120 CPEs per three-year cycle.
- CRL (Certificate Revocation List)
- A list published by a Certificate Authority of certificates that have been revoked before their expiry date.
- DAC (Discretionary Access Control)
- An access control model in which the owner of a resource decides who may access it.
- DAST (Dynamic Application Security Testing)
- Security testing of a running application from the outside, simulating an attacker. Contrast with SAST, which analyses source code.
- DMARC
- Domain-based Message Authentication, Reporting and Conformance: a policy that tells email receivers what to do with messages that fail SPF or DKIM checks.
- Due care / due diligence
- Due care is doing what a reasonable person would do to protect assets; due diligence is the ongoing verification that those actions remain effective.
- HMAC
- Hash-based Message Authentication Code: a hash combined with a shared secret key, providing integrity and authentication but not non-repudiation.
- Kerberos
- A ticket-based authentication protocol using a trusted Key Distribution Center; used by Active Directory. Requires synchronised clocks.
- MAC (Mandatory Access Control)
- An access control model in which access is determined by centrally enforced security labels that users cannot override.
- MTD (Maximum Tolerable Downtime)
- The longest a business function can be unavailable before the damage becomes unacceptable. RTO + WRT must be less than MTD.
- OCSP (Online Certificate Status Protocol)
- A protocol for checking the revocation status of a digital certificate in real time, as an alternative to downloading a CRL.
- PFS (Perfect Forward Secrecy)
- A property of key exchange (e.g. ephemeral Diffie-Hellman) ensuring that compromise of a long-term private key does not expose past session keys or recorded traffic.
- RBAC (Role-Based Access Control)
- An access control model in which permissions are assigned to roles and users inherit permissions from their roles.
- RPO (Recovery Point Objective)
- The maximum acceptable data loss measured in time. An RPO of one hour means backups must occur at least hourly.
- RTO (Recovery Time Objective)
- The target time within which a business function or system must be restored after a disruption.
- SAML
- Security Assertion Markup Language: an XML-based standard for exchanging authentication and authorisation assertions between an identity provider and a service provider.
- SAST (Static Application Security Testing)
- Security testing that analyses source code without executing the application. Contrast with DAST.
- SIEM
- Security Information and Event Management: a system that centralises logs from many sources, correlates events, and generates alerts.
- SLE (Single Loss Expectancy)
- The expected monetary loss from a single occurrence of a risk: SLE = Asset Value × Exposure Factor.
- SOC 2 Type II
- An audit report assessing whether a service provider’s controls operated effectively over a period of time, against the Trust Services Criteria.
- STRIDE
- A threat modelling framework categorising threats as Spoofing, Tampering, Repudiation, Information disclosure, Denial of service, and Elevation of privilege.
- TCB (Trusted Computing Base)
- The totality of hardware, firmware and software that enforces a system’s security policy. A smaller TCB is easier to verify.
- TGT (Ticket Granting Ticket)
- In Kerberos, the ticket issued after initial authentication that allows the user to request service tickets without re-entering credentials.
- TOCTOU
- Time-of-check to time-of-use: a race condition in which the state of a resource changes between a security check and its use.
- WRT (Work Recovery Time)
- The time needed to test and verify systems after recovery before they return to normal operation. RTO + WRT must be less than MTD.
- Zero trust
- A security model that assumes no implicit trust based on network location: every access request is authenticated, authorised and encrypted. Principles: verify explicitly, least privilege, assume breach.
Advertisement