Windows Tools, Command Line, Settings & Networking

A+ Core 2 220-1202 · Operating Systems

By Abu Anns · Last updated 20 November 2026Exam version: 220-1202 (V15, current)

This guide covers the four most hands-on objectives in the Operating Systems domain: Windows features and tools, command-line tools, Windows settings, and Windows networking features. These objectives are where Core 2 rewards actual practice: the exam asks which tool to use for a task, and the only reliable way to learn that is to open the tools and use them.

Windows features and tools

Task Manager is the first tool for a slow or frozen computer. Its tabs show Processes (what is running and how much CPU, memory, disk, and network each process uses), Performance (graphs of CPU, memory, disk, and network usage), Users (who is logged in), Startup (which programs launch at boot — disabling unnecessary ones speeds up startup), and Services (background services, which can be started, stopped, or restarted). A process using 100% of the CPU or disk is the first thing to look for when a computer is slow.

The Microsoft Management Console (MMC) snap-ins are the deeper administrative tools, each launched by its own .msc file. Event Viewer (eventvwr.msc) shows system, application, and security logs — the first place to look for the cause of a crash or error. Disk Management (diskmgmt.msc) manages partitions, drive letters, and formatting. Task Scheduler (taskschd.msc) runs programs automatically on a schedule. Device Manager (devmgmt.msc) shows hardware devices and their drivers; a yellow warning icon means a driver problem. Certificate Manager (certmgr.msc) manages digital certificates. Local Users and Groups (lusrmgr.msc) manages local accounts. Performance Monitor (perfmon.msc) provides detailed performance logging and counters. Group Policy Editor (gpedit.msc) configures system policies (Pro and above only).

Additional tools include System Information (msinfo32.exe), which shows a complete hardware and software summary; Resource Monitor (resmon.exe), which shows real-time resource usage in more detail than Task Manager; System Configuration (msconfig.exe), which controls startup options, boot settings, and services (useful for diagnosing startup problems with a clean boot); Disk Cleanup (cleanmgr.exe), which removes temporary files; Disk Defragment (dfrgui.exe), which optimizes drive layout (for HDDs; SSDs should not be defragmented); and Registry Editor (regedit.exe), which edits the Windows registry — powerful and dangerous, since a wrong change can make the system unbootable.

Command-line tools

The Windows command line is heavily tested, so learn these commands by purpose. Navigation: cd (change directory), dir (list contents). Disk management: chkdsk (check a disk for errors), format (format a drive), diskpart (partition management). File management: md (make directory), rmdir (remove directory), robocopy (robust file copying, including mirroring folders). Network: ipconfig (show IP configuration; ipconfig /all shows details, /release and /renew get a new DHCP address, /flushdns clears the DNS cache), ping (test connectivity), netstat (show active connections and listening ports), nslookup (query DNS), net use (map network drives), tracert (trace the route to a host), pathping (tracert plus packet-loss statistics). Informational: hostname (show the computer name), net user (manage user accounts), winver (show the Windows version), whoami (show the current user), [command] /? (show help for any command). OS management: gpupdate (refresh Group Policy), gpresult (show applied policies), sfc (System File Checker — sfc /scannow repairs corrupted system files).

Windows settings

Windows settings are split between the modern Settings app and the older Control Panel, and the exam tests both. Key Control Panel areas include Internet Options (browser and connection settings), File Explorer Options (show hidden files, hide file extensions, general and view options), Devices and Printers, Programs and Features (uninstall software), Network and Sharing Center, System, Windows Defender Firewall, Mail, Sound, User Accounts, Device Manager, Indexing Options, and Administrative Tools. The Settings app covers Ease of Access (accessibility features), Time and Language, Update and Security, Personalization, Apps, Privacy, System, Devices, Network and Internet, Accounts, and Gaming.

Power Options deserve attention: power plans (Balanced, Power Saver, High Performance) control how aggressively the system saves energy; Sleep/suspend keeps the session in RAM with low power; Hibernate writes the session to disk and powers off completely; Standby is a low-power state; choose what closing the lid does sets the laptop's behaviour when the lid closes; turn on fast startup combines shutdown with hibernation for faster boot; and USB selective suspend lets Windows power down individual USB devices to save energy.

Windows networking features

A Windows client can be domain joined (managed centrally by Active Directory, with shared resources, Group Policy, and single sign-on) or in a workgroup (a peer-to-peer grouping with no central management). Shared resources include printers, file servers, and mapped drives (a network share assigned a drive letter). The local OS firewall (Windows Defender Firewall) controls inbound and outbound traffic with application restrictions and exceptions. Client network configuration covers the IP addressing scheme, DNS settings, subnet mask, gateway, and static vs. dynamic addressing. Establishing network connections includes VPN, wireless, wired, and WWAN/cellular connections. Proxy settings route web traffic through a proxy server. Public vs. private network profiles change the firewall rules: a private network trusts other devices on the network, while a public network blocks most incoming connections. File Explorer navigation — network paths use UNC paths such as \\server\share. Metered connections limit background data usage on connections with a data cap — Windows Update and other services behave differently on a metered connection.

Putting the tools together: a diagnostic workflow

Knowing each tool is only half the skill — the exam tests whether you know which tool to reach for first. A practical workflow for a slow Windows PC is: open Task Manager and identify whether CPU, memory, disk, or network is the bottleneck; if a process is misbehaving, end it and investigate; if the disk is at 100%, check Disk Management and free space; if the system is unstable, run sfc /scannow and check Event Viewer for errors around the time of the problem; if startup is slow, use the Startup tab of Task Manager and msconfig to disable unnecessary programs. For a network problem, the sequence is: ipconfig to check the address (an APIPA address means DHCP failed), ping the gateway and then an external address to find where connectivity breaks, nslookup to test DNS, and tracert to find where the path fails. For a suspected driver problem, Device Manager shows warning icons on faulty devices. Learning these sequences — not just the individual tools — is what turns tool knowledge into exam answers.

Advertisement

Exam traps to watch for

Practice questions

Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.

Q1.A user's computer is very slow. Task Manager shows one process using 95% of the CPU continuously. What is the best first step?

Report an error

Q2.A technician needs to find out why a computer crashed yesterday. Which tool shows the system and application logs from that time?

Report an error

Q3.A user cannot reach a website by name, but the website works for everyone else. The technician suspects a stale DNS entry on the user's computer. Which command clears the DNS resolver cache?

Report an error

Q4.A Windows system is behaving strangely after a failed update, and the technician suspects corrupted system files. Which command checks and repairs protected Windows system files?

Report an error

Q5.A technician needs to copy a large folder structure from one server to another, preserving permissions and resuming if the copy is interrupted. Which command is best suited to this?

Report an error

Q6.A laptop user wants the computer to use no power when closed overnight but to resume exactly where they left off in the morning. Which power state should be configured for closing the lid?

Report an error

Q7.A user connects a laptop to a hotel Wi-Fi network. Windows asks whether the network is private or public. Which should the user choose, and why?

Report an error

Q8.A technician has just changed a Group Policy setting on a domain-joined computer and wants the change to apply immediately without waiting for the automatic refresh. Which command should be run?

Report an error