Hardware: Displays, Cables, RAM, Storage, Boards & Power
A+ Core 1 220-1201 · Hardware
Hardware is the second-largest domain on Core 1 at 25%, and it is the most fact-dense: displays, cables, RAM, storage, motherboards, CPUs, and power supplies each have their own vocabulary, and the exam tests them all. The good news is that this content is very learnable — it is mostly comparison tables, and a candidate who works through the tables in this guide has covered most of the domain.
Displays
The dominant display technology is LCD (liquid crystal display), in which a backlight shines through liquid crystals that control how much light passes. LCD panels come in three main types: TN (twisted nematic) panels are cheap and fast but have poor viewing angles and colour; IPS (in-plane switching) panels have wide viewing angles and accurate colour, making them the standard for office and creative work; VA (vertical alignment) panels sit between the two, with better contrast than IPS but slower response times. OLED (organic light-emitting diode) displays have no backlight — each pixel produces its own light — giving perfect blacks and excellent contrast, but they can suffer from burn-in if a static image is displayed for a long time. Mini-LED is an LCD variant with a backlight made of thousands of tiny LEDs, offering better contrast and brightness than conventional LCD.
Display attributes the exam tests include resolution (the number of pixels, e.g. 1920x1080), refresh rate (how many times per second the image is redrawn, measured in Hz — higher is smoother), pixel density (pixels per inch; higher density looks sharper), and colour gamut (the range of colours the display can reproduce). A touch screen/digitizer is the layer that detects touch input; a cracked digitizer can leave the display working but touch unresponsive. Older CCFL-backlit LCDs used an inverter to power the backlight — a failed inverter caused a dim image — but modern LED-backlit displays do not have one.
Cables and connectors
Network cabling is mostly twisted pair: UTP (unshielded twisted pair) is the standard Ethernet cable, while STP (shielded twisted pair) adds shielding against electromagnetic interference for noisy environments. Categories define speed and bandwidth: Cat5e supports 1 Gbps, Cat6 supports 10 Gbps over shorter runs, and Cat6a supports 10 Gbps over the full 100 meters. The wires inside are terminated to the T568A or T568B wiring standards — the two ends of a cable must use the same standard (a straight-through cable) or different standards (a crossover cable, now largely unnecessary because modern ports auto-detect). Coaxial cable (with F-type connectors) carries cable TV and cable internet. Plenum-rated cable has a fire-resistant jacket required when cable runs through air-handling spaces above ceilings. Direct burial cable is armoured for underground runs.
Fiber optic cable carries data as light: single-mode fiber uses a narrow core and a laser, travelling long distances (kilometres) at high speed, while multimode fiber uses a wider core and LEDs, for shorter runs inside buildings. Fiber connectors include ST (straight tip, bayonet), SC (subscriber connector, push-pull), and LC (Lucent connector, small form factor). Video cables: HDMI carries digital video and audio and is the consumer standard; DisplayPort is the computer standard, also carrying audio and supporting higher resolutions; DVI is digital video only (older); VGA is analogue video (legacy). Thunderbolt (over a USB-C connector) carries data, video, and power at very high speed. Hard drive cables are SATA (internal) and eSATA (external). Peripheral connectors include USB 2.0/3.0, USB-C, microUSB/miniUSB, Lightning, RJ11 (phone), RJ45 (Ethernet), DB9 (serial), and Molex (internal power).
RAM
RAM comes in two physical form factors: DIMM (dual in-line memory module) for desktops and SODIMM (small outline DIMM) for laptops. The generations are DDR, DDR2, DDR3, DDR4, and DDR5 — each generation is faster than the last and physically keyed differently, so a DDR4 module cannot fit in a DDR5 slot. ECC (error-correcting code) RAM detects and corrects single-bit memory errors and is used in servers and workstations where data integrity matters; non-ECC RAM is the standard for desktops and laptops, and the two types cannot be mixed. Channel configurations describe how memory modules work together: single-channel uses one module, dual-channel uses matched pairs for roughly double the bandwidth, and triple/quad-channel configurations use three or four matched modules. For dual-channel to work, modules should be installed in the correct slots (usually colour-matched) and ideally be identical in size and speed.
Storage
Hard disk drives (HDDs) store data on spinning magnetic platters. Key attributes are spindle speed (5,400 or 7,200 RPM for desktops; faster means quicker access) and form factor (3.5-inch for desktops, 2.5-inch for laptops). Solid-state drives (SSDs) have no moving parts and are much faster. SSDs connect via SATA (limited to about 600 MB/s) or NVMe over PCIe (several GB/s), and come in form factors including 2.5-inch, M.2 (a small stick that plugs directly into the motherboard), and the older mSATA. SAS (Serial Attached SCSI) is an enterprise interface for high-performance and high-reliability drives.
RAID (Redundant Array of Independent Disks) combines multiple drives for speed, redundancy, or both. RAID 0 stripes data across two or more drives for speed, with no redundancy — one drive failure loses everything. RAID 1 mirrors data across two drives, so one can fail without data loss, but usable capacity is halved. RAID 5 stripes data with parity across three or more drives, surviving one drive failure. RAID 6 uses double parity across four or more drives, surviving two failures. RAID 10 (1+0) mirrors and then stripes, needing at least four drives and surviving one failure per mirrored pair — the best combination of speed and redundancy, at the highest cost. Removable storage includes flash drives and memory cards (SD, microSD), and optical drives (CD/DVD/Blu-ray) are still used for media and legacy software.
Motherboards, CPUs, and power
Motherboard form factors are ATX (full size), microATX (smaller, fewer slots), and ITX (mini-ITX, very small). The motherboard's connector types include PCIe slots (for expansion cards), SATA ports, M.2 slots, power connectors, and headers for front-panel ports. Compatibility is governed by the CPU socket: AMD and Intel use different sockets, and even within a brand, a socket fits only certain CPU generations — always check the motherboard's CPU support list. BIOS/UEFI settings control boot options, USB permissions, TPM security features, Secure Boot, boot and BIOS passwords, temperature monitoring, virtualization support, and encryption features (TPM and HSM). Secure Boot ensures only signed operating systems can boot; the TPM (Trusted Platform Module) is a chip that stores encryption keys and supports features such as BitLocker.
CPU architecture is either x86/x64 (Intel and AMD, the standard for desktops and servers) or ARM (used in phones, tablets, and increasingly in laptops for its power efficiency). Core configurations matter: more cores handle more simultaneous tasks, and multithreading lets one core run two threads at once. Some servers use multisocket boards with two or more CPUs. Cooling keeps all of this alive: fans move air, heat sinks draw heat away from the CPU, thermal paste or pads fill the gap between the CPU and heat sink, and liquid cooling circulates coolant for high-performance systems. Expansion cards include sound cards, video cards, capture cards, and network interface cards.
The power supply (PSU) converts mains AC to the DC voltages a PC needs: 12V for motors and high-power components, 5V and 3.3V for logic circuits. Input voltage is 110–120 VAC in North America and 220–240 VAC in most of the rest of the world — many PSUs have a voltage selector switch, and setting it wrong can damage the unit. The main motherboard connector is the 20+4 pin connector. A modular PSU lets you attach only the cables you need, improving airflow. Wattage rating must cover the system's total draw with headroom (a high-end graphics card can draw 300W or more alone). Energy efficiency is rated by the 80 PLUS program (Bronze, Silver, Gold, Platinum, Titanium). Redundant power supplies in servers let one PSU fail without the server going down.
Exam traps to watch for
- Saying RAID 0 provides redundancy: it stripes for speed only, and one failed drive loses all data. RAID 1 is the mirror.
- Mixing up DDR generations: DDR3, DDR4, and DDR5 modules are keyed differently and are not interchangeable — check the motherboard's supported type.
- Confusing single-mode and multimode fiber: single-mode goes farther (kilometres, laser), multimode is for shorter in-building runs (LED).
- Forgetting that dual-channel RAM needs matched modules in the correct (usually colour-matched) slots — one module, or modules in the wrong slots, runs in single-channel mode.
Practice questions
Test yourself on this guide. Answers are checked instantly, with a full explanation for each question.
Q1.A small business server needs storage that survives the failure of any single drive and provides good read performance, using three drives. Which RAID level should be used?
Explanation: RAID 5 stripes data with parity across three or more drives and survives any single drive failure, which matches the requirement with three drives. Option C is wrong because RAID 0 has no redundancy — one failure loses all data. Option B is wrong because RAID 1 uses exactly two mirrored drives (and with three drives it is not the standard configuration). Option D is wrong because RAID 10 requires a minimum of four drives.
Exam objective: 220-1201 Objective 3.4: Compare and contrast storage devices
Q2.A user wants the fastest possible storage upgrade for a desktop that has an M.2 slot supporting NVMe. Which drive should the technician recommend?
Explanation: NVMe over PCIe delivers several GB/s, far beyond SATA's roughly 600 MB/s limit, making an NVMe M.2 SSD the fastest option for a board with a supporting slot. Option B is wrong because a spinning HDD is the slowest option by a wide margin. Option C is wrong because a SATA SSD is limited by the SATA interface even though it is much faster than an HDD. Option D is wrong because mSATA is an older, smaller SATA interface — not the newest, and slower than NVMe.
Exam objective: 220-1201 Objective 3.4: Compare and contrast storage devices
Q3.A technician is upgrading a desktop that currently has one 8 GB DDR4 module. The user wants 16 GB running in dual-channel mode. What should the technician install?
Explanation: Dual-channel mode needs two matched modules in the correct paired (usually colour-matched) slots, so adding a second 8 GB DDR4 module of the same speed is the right upgrade. Option A is wrong because DDR3 is a different generation and will not fit a DDR4 slot. Option B is wrong because DDR5 does not fit a DDR4 board, and a single module would still run in single-channel mode. Option C is wrong because adding two 4 GB modules alongside the existing 8 GB gives 16 GB but with mismatched module sizes across the channels, not the matched pair dual-channel mode needs.
Exam objective: 220-1201 Objective 3.3: Compare and contrast RAM characteristics
Q4.A company needs to run network cable between two buildings 800 meters apart. Which cable type is the best choice?
Explanation: Single-mode fiber uses a laser and a narrow core to carry signals over kilometres, making it the right choice for an 800-meter run. Option C is wrong because twisted-pair Ethernet is limited to 100 meters per run. Option A is wrong because coaxial cable is used for cable TV/internet drops, not building-to-building data links. Option D is wrong because multimode fiber is limited to shorter runs (typically a few hundred meters at high speeds) and would not reliably cover 800 meters.
Exam objective: 220-1201 Objective 3.2: Summarize basic cable types and their connectors, features, and purposes
Q5.A graphic designer needs a monitor with accurate colours and wide viewing angles for photo editing. Which panel type is the best choice?
Explanation: IPS panels are the standard choice for colour-critical work because they combine wide viewing angles with accurate, consistent colour. Option A is wrong because TN panels are fast but have poor viewing angles and washed-out colour. Option B is wrong because VA panels have good contrast but slower response and less colour accuracy than IPS. Option D is wrong because OLED is typically the most expensive option, not the cheapest (and it also carries burn-in risk for static images).
Exam objective: 220-1201 Objective 3.1: Compare and contrast display components and attributes
Q6.A server must keep running even if one power supply fails. Which feature should the technician specify?
Explanation: Redundant power supplies (usually in a 1+1 configuration) mean the server keeps running on the surviving PSU if one fails. Option C is wrong because modular only means detachable cables, which improves airflow but provides no failover. Option D is wrong because 80 PLUS Titanium is an efficiency rating, not a redundancy feature. Option B is wrong because the 20+4 pin connector is the standard motherboard power connector on any ATX PSU.
Exam objective: 220-1201 Objective 3.6: Given a scenario, install the appropriate power supply
Q7.A technician is building a PC with a new Intel CPU. The motherboard box lists an AMD AM5 socket. What is the problem?
Explanation: CPU sockets are vendor- and generation-specific: an Intel CPU physically cannot fit in an AMD AM5 socket, and the electrical pin layout is different. Option D is wrong because the CPU cannot be installed at all. Option A is wrong because no BIOS update can change a physical socket. Option B is wrong because the problem is the CPU socket, not the RAM.
Exam objective: 220-1201 Objective 3.5: Given a scenario, install and configure motherboards, central processing units (CPUs), and add-on cards
Q8.A user in the UK buys a desktop PC from the US. The power supply has a red voltage selector switch on the back. What should the user do before plugging it in?
Explanation: The UK mains supply is 230V, while the US uses 110–120V. A PSU with a manual selector must be set to 220–240 VAC before use in the UK, or it can be damaged (or damage components). Option B is wrong because not all PSUs auto-detect — the presence of a manual switch means this one does not. Option D is wrong because 110–120V is the US setting, not the UK setting. Option A is wrong because the switch is a functional voltage selector, not a test feature.
Exam objective: 220-1201 Objective 3.6: Given a scenario, install the appropriate power supply