A+ Core 1 220-1201 Exam Prep
Free CompTIA A+ Core 1 study guides, practice questions with explanations, and a timed mock test — no signup, no paywall.
A+ Core 1 exam facts
- Exam code
- 220-1201
- Exam version
- 220-1201 (V15, current)
- Exam fee
- $274 USD
- Questions
- Maximum of 90 (real exam)
- Duration
- 90 minutes (real exam)
- Passing score
- 675 (on a scale of 100–900)
Exam domains
How the real exam is weighted:
CompTIA A+ Core 1 (exam code 220-1201) is the first of the two exams that make up the CompTIA A+ certification, the industry-standard entry-level credential for IT support roles. Core 1 covers the physical side of IT support: mobile devices, networking, hardware, virtualization and cloud computing, and hardware and network troubleshooting. It tests whether you can install, configure, and fix the devices and connections that end users rely on every day — laptops, phones, desktops, printers, and the networks that link them together.
You need both Core 1 and Core 2 to earn the A+ certification. Passing only one exam earns you no credential, and both exams must come from the same version series — you cannot mix a V15 Core 1 with an older Core 2. Core 2 (220-1202) covers operating systems, security, software troubleshooting, and operational procedures, and it has its own study package on this site at /aplus-core-2/. You can take the two exams in either order, and most candidates sit them a few weeks apart, starting with Core 1.
Exam format at a glance
The current version is 220-1201 (V15), launched on 25 March 2025. The previous version, 220-1101, retired on 25 September 2025, so 220-1201 is the only Core 1 exam available. The exam has a maximum of 90 questions and a 90-minute time limit, mixing multiple-choice questions (single and multiple response), drag-and-drop items, and performance-based questions (PBQs) — short simulations such as matching a cable to the right port, configuring a setting, or ordering the steps of a procedure. CompTIA recommends about 12 months of hands-on experience in an IT support specialist role, but there are no formal prerequisites: anyone can book the exam.
Your result is a scaled score from 100 to 900, and the passing score is 675. The scaling means 675 is not simply 75% of the questions answered correctly — CompTIA sets the passing score by statistical analysis and does not publish a conversion from correct answers to scaled score. The exam costs $274 USD per attempt (CompTIA list price; confirm the current price in CompTIA's store before booking, as prices change). It is delivered by Pearson VUE at a test center or as an online proctored exam from home. The A+ certification is valid for three years once you have passed both exams.
The five domains
CompTIA publishes the weight of each domain in the official exam objectives:
| Domain | Weight | What it covers |
|---|---|---|
| Mobile Devices | 13% | Laptop and mobile hardware replacement, accessories and connectivity, mobile network setup and application support |
| Networking | 23% | TCP/UDP ports and protocols, wireless standards, network services, configuration concepts, hardware, SOHO setup, connection types, tools |
| Hardware | 25% | Displays, cables and connectors, RAM, storage and RAID, motherboards, CPUs, power supplies, printers |
| Virtualization and Cloud Computing | 11% | Virtual machines, hypervisors, containers, cloud models and service types |
| Hardware and Network Troubleshooting | 28% | Diagnosing faults in motherboards, RAM, CPUs, power, drives, displays, mobile devices, networks, and printers |
Troubleshooting is the single largest domain at 28%, and it is also the most scenario-heavy: the questions describe symptoms and ask you to pick the most likely cause or the best next step. That makes it the hardest domain to cram and the most rewarding to practice. The hardware and networking domains are more fact-based — ports, cable types, RAM generations, RAID levels — and reward steady memorization. Virtualization and cloud computing is the smallest domain at 11% but the most conceptual: a few hours of study covers it well.
Who is this exam for?
Core 1 is aimed at anyone starting an IT support career: help desk technicians, desktop support specialists, field service technicians, and career changers with basic computer knowledge. It is also the usual first certification for people moving from a non-IT job into technology, because it assumes hands-on familiarity with computers rather than programming or advanced networking knowledge. If you can take apart a laptop, set up a home network, and explain why a printer is not working, you already have the instincts this exam tests — the study guides on this site turn those instincts into exam-ready knowledge.
How to use this site to prepare
Work through the eight study guides in order. Each one covers a slice of the official objectives in plain language, with comparison tables where topics overlap (RAM generations, RAID levels, Wi-Fi standards, cable types) and a list of exam traps: the mistakes candidates most often make on that topic. Every guide ends with eight original practice questions written from the official 220-1201 objectives, each with a full explanation of why the correct answer is right and why each wrong answer is wrong. Read the explanations even when you answer correctly — they are where the learning happens.
When you have worked through the guides, take the timed mock test: 50 questions drawn across all five domains in the exam's own weightings, scored by domain so you can see exactly where to go back and re-study. The cheat sheet page collects the ports, cable standards, and troubleshooting symptom tables worth memorizing in the last few days before the exam, and the glossary covers the acronyms CompTIA lists for this exam. A realistic study rhythm is one guide per day with its questions, a mock test at the end of each week, and a final full review of your missed questions in the last week. Our study planner page lays out 2-week, 4-week, and 8-week plans matched to different starting points.
What comes after Core 1?
Pass Core 2 (220-1202) to earn the full A+ certification — the two exams together are the credential employers ask for. After A+, the natural next steps are CompTIA Network+ (deeper networking) or Security+ (entry-level cybersecurity), both of which build directly on the networking and security foundations in the A+ objectives. Passing a higher CompTIA exam also renews your A+ for another three years, so the certifications fit together neatly. The A+ itself is the entry point: it gets your CV past screening for help desk and desktop support roles, and the hands-on troubleshooting habits it teaches are the ones you will use every day in your first IT job.
Study guides
Mobile Devices: Hardware, Accessories & Connectivity
Mobile Devices
Ports, Protocols & Wireless Networking
Networking
Network Services, Hardware & SOHO Setup
Networking
Hardware: Displays, Cables, RAM, Storage, Boards & Power
Hardware
Printers & Multifunction Devices
Hardware
Virtualization & Cloud Computing
Virtualization and Cloud Computing
Troubleshooting Hardware, Drives, Displays & Mobile Devices
Hardware and Network Troubleshooting
Troubleshooting Network & Printer Issues
Hardware and Network Troubleshooting
Frequently Asked Questions
How much does the A+ Core 1 exam cost?
The 220-1201 exam costs $274 USD per attempt at CompTIA list price (as of late 2026). Each retake costs the full fee again, and CompTIA offers no free retests or retake discounts. Because you need both Core 1 and Core 2 to certify, budget $548 for the pair. Confirm the current price in CompTIA's store before booking, as CompTIA changes prices without notice.
Do I need to pass both Core 1 and Core 2 to get the A+ certification?
Yes. The A+ certification is only awarded when you pass both 220-1201 (Core 1) and 220-1202 (Core 2), and both exams must be from the same version series (V15). You can take them in either order, and there is no time limit between them, but a pass in one exam alone earns no credential.
What is the passing score for A+ Core 1?
675 on a scaled score range of 100 to 900. The score is scaled, so 675 is not a simple percentage of questions answered correctly, and CompTIA does not publish how many correct answers it takes to pass. Core 2 has a higher passing score of 700 on the same scale.
How many questions are on the Core 1 exam, and how long do I get?
A maximum of 90 questions in 90 minutes — roughly one minute per question. The mix includes multiple-choice (single and multiple response), drag-and-drop, and performance-based questions (PBQs), which are short hands-on simulations. The exact number of questions on your exam form may be fewer than 90.
What happens if I fail Core 1? Can I retake it?
Yes. CompTIA requires no waiting period between your first and second attempt — you can rebook immediately. Before a third or later attempt, you must wait at least 14 calendar days from your last attempt. Every attempt costs the full $274. Once you pass an exam, you cannot retake the same exam code without CompTIA's prior consent.
Is the 220-1101 exam still available?
No. The English version of 220-1101 and 220-1102 retired on 25 September 2025. The current exams are 220-1201 and 220-1202 (V15), launched 25 March 2025, and CompTIA estimates they will run until around September 2028. Study material written for 220-1101/1102 is partly out of date — check that any book or course you use is written for the 1200 series.