CCNA Cheat Sheet

Quick-reference summary of the key facts for the 200-301 exam.

By Abu Anns · Last updated 20 November 2026Exam version: 200-301 v1.1 (current until 2 Feb 2027)

This cheat sheet collects the facts worth memorising in the last few days before the exam. It is a revision aid, not a substitute for the study guides: if any line here is unfamiliar, go back to the guide that explains it before you sit the exam. The highest-value items are the subnetting table, the port numbers, and the administrative distances — those three topics produce more exam questions than any other facts on this page.

Subnetting quick reference

Usable hosts = 2^(host bits) - 2. Block size = 256 - mask value in the interesting octet. Subnets created = 2^(borrowed bits).

PrefixMaskBlock sizeUsable hosts
/30255.255.255.25242 (point-to-point links)
/29255.255.255.24886
/28255.255.255.2401614
/27255.255.255.2243230
/26255.255.255.1926462
/25255.255.255.128128126
/24255.255.255.0256254
/23255.255.254.0512510
/22255.255.252.010241022
/20255.255.240.040964094
/16255.255.0.06553665534

Private ranges (RFC 1918): 10.0.0.0/8, 172.16.0.0/12 (172.16.0.0 - 172.31.255.255), 192.168.0.0/16. Loopback: 127.0.0.0/8. APIPA: 169.254.0.0/16. Multicast: 224.0.0.0/4.

Key port numbers

ServicePortProtocol
FTP20/21TCP
SSH22TCP
Telnet23TCP
SMTP25TCP
DNS53UDP (TCP for zone transfers)
DHCP67 (server) / 68 (client)UDP
TFTP69UDP
HTTP80TCP
POP3110TCP
NTP123UDP
SNMP161 (query) / 162 (trap)UDP
HTTPS443TCP
Syslog514UDP
TACACS+49TCP
RADIUS1812 (auth) / 1813 (acct)UDP

Administrative distances

Connected 0, Static 1, EIGRP internal 90, OSPF 110, RIP 120, iBGP 200, Unreachable 255. Lower AD wins between routes to the same prefix — but longest prefix match is checked first.

Command summary

Facts worth memorising

OSPF and spanning tree at a glance

OSPF: link-state protocol, AD 110, single area 0 for the CCNA. Neighbours need the same area, subnet, hello/dead timers (10/40 seconds on broadcast and point-to-point links), authentication, and stub flags, plus unique router IDs. The router ID is the manually configured value if one is set, else the highest loopback address, else the highest active physical interface address. On broadcast networks the DR and BDR are elected by highest priority (default 1, 0 means never), then highest router ID. DR/BDR listen on 224.0.0.6; all OSPF routers listen on 224.0.0.5. Cost equals reference bandwidth (default 100 Mbps) divided by interface bandwidth, minimum 1. Adjacency states run Down, Init, 2-Way, ExStart, Exchange, Loading, Full — the adjacency is fully synchronised only in the Full state. Use passive-interface on LAN segments with no neighbours.

Spanning tree (Rapid PVST+): one instance per VLAN. The root bridge has the lowest bridge ID (priority, default 32768 in steps of 4096, then MAC address). Each non-root switch picks one root port (lowest path cost to the root); each segment has one designated port; other ports are alternate (blocked). Port states are discarding, learning, and forwarding. PortFast goes straight to forwarding on endpoint ports only. BPDU guard error-disables a PortFast port that receives a BPDU; BPDU filter stops BPDUs entirely; root guard blocks a port receiving a superior BPDU; loop guard keeps a port blocked when BPDUs stop arriving. EtherChannel: LACP active initiates, passive responds (passive-passive fails); PAgP desirable/auto behave the same way; mode on forces the bundle without negotiation; member links must match speed, duplex, and VLAN.

Troubleshooting quick checks

Advertisement