CCNA 200-301 Mock Test
50 timed questions · 55 minutes · scored by domain, with re-study links for your weakest areas.
How it works: the timer starts as soon as this page loads. Answer each question, use the numbered dots to jump around, and flag questions to come back to. You see no feedback until you submit — just like the real exam. The pass guide is 70%: note that some vendors (including AWS) use scaled scoring and do not publish a percentage pass mark, so 70% is a study guide only.
Q1.What is the broadcast address of the 10.10.40.0/21 subnet?
Explanation: A /21 mask is 255.255.248.0, so the block size in the third octet is 256 - 248 = 8. The subnet 10.10.40.0/21 covers 10.10.40.0 through 10.10.47.255, so the broadcast address is 10.10.47.255. Option A (.40.255) is the broadcast of a /24, not a /21. Option B (.43.255) is not a subnet boundary for a /21. Option D (.55.255) is the broadcast of the next-but-one subnet (10.10.48.0/21 covers .48 to .55).
Exam objective: 200-301 1.6: Configure and verify IPv4 addressing and subnetting — broadcast address
Q2.Which address is a valid global unicast IPv6 address?
Explanation: Global unicast addresses come from the 2000::/3 range, so 2001:db8:1::1 (from the documentation prefix) is a global unicast address. Option B is a link-local address (fe80::/10). Option C is the all-nodes multicast address (ff00::/8). Option D is the loopback address (::1/128).
Exam objective: 200-301 1.9: Describe IPv6 address types — unicast (global)
Q3.A host in VLAN 10 (192.168.10.0/24) cannot reach a host in VLAN 20 (192.168.20.0/24). The trunk between the switches carries both VLANs, and the SVIs on the Layer 3 switch are up with correct IP addresses. What should the engineer check first on the VLAN 10 host?
Explanation: InterVLAN traffic must go through the host's default gateway, which is the SVI of its own VLAN — if the gateway is missing or wrong, the host cannot reach any other subnet even though the switching and routing are correctly configured. Option A is wrong because modern interfaces auto-detect cable type, and a cable problem would break all connectivity, not just interVLAN traffic. Option C is wrong because DNS affects name resolution, not IP routing between subnets. Option D is wrong because host ports are access ports, not trunks.
Exam objective: 200-301 2.1: Configure and verify VLANs (normal range) spanning multiple switches — interVLAN connectivity
Q4.In Rapid PVST+, which port state both forwards frames and learns MAC addresses?
Explanation: A port in the forwarding state forwards frames and learns MAC addresses normally — it is the active state for root and designated ports. Option A is wrong because a discarding port does neither. Option B is wrong because listening is a legacy 802.1D state that does not exist in RSTP. Option C is wrong because a learning port learns MAC addresses but does not forward frames yet.
Exam objective: 200-301 2.5: Interpret basic operations of Rapid PVST+ Spanning Tree Protocol — port states
Q5.An EtherChannel is configured between two switches. One side is set to LACP active mode and the other side is set to mode on. What is the result?
Explanation: Mode on forms a channel without any negotiation, so it sends no LACP messages; the LACP active side waits for LACPDUs that never arrive and its ports remain unbundled, while the on side brings its channel up — a misconfiguration that can cause traffic blackholing. Option A is wrong because LACP and static mode on are not compatible. Option C is wrong because switches never convert LACP to PAgP automatically. Option D is wrong because Spanning Tree does not police EtherChannel mode mismatches.
Exam objective: 200-301 2.4: Configure and verify (Layer 2/Layer 3) EtherChannel (LACP)
Q6.An engineer needs to manage a router remotely from another building, using an encrypted command-line session. Which management method should be used?
Explanation: SSH (TCP 22) provides encrypted remote command-line access, protecting credentials and configuration data in transit — the correct choice for remote management. Option A is wrong because Telnet sends everything, including passwords, in plaintext. Option B is wrong because console access requires a physical cable to the device and cannot be used remotely from another building. Option D is wrong because HTTP is unencrypted; HTTPS would be the secure web-based option, but the question asks for command-line access.
Exam objective: 200-301 2.8: Describe network device management access (Telnet, SSH, HTTP, HTTPS, console, TACACS+/RADIUS, and cloud managed)
Q7.A router learns the network 172.16.0.0/16 from EIGRP (AD 90) and from OSPF (AD 110). Which route is installed in the routing table, and why?
Explanation: When two routes to the same destination have the same prefix length, the router installs the one with the lower administrative distance: EIGRP (90) beats OSPF (110). Option A is wrong because the protocol type does not decide — AD does. Option B is wrong because routers do not load-balance between routes from different protocols with different ADs. Option C is wrong because AD exists precisely to resolve this choice.
Exam objective: 200-301 3.2: Determine how a router makes a forwarding decision by default — administrative distance
Q8.What are the default OSPF hello and dead intervals on a broadcast network?
Explanation: On broadcast and point-to-point networks, OSPF sends hello packets every 10 seconds and declares a neighbour dead after 40 seconds without a hello (four times the hello interval). Option B is wrong because 5/15 are not OSPF defaults on any network type. Option C is wrong because 30/120 are the hello/dead intervals for NBMA networks, not broadcast networks. Option D is wrong because the dead interval is four times the hello interval, not equal to it.
Exam objective: 200-301 3.4: Configure and verify single area OSPFv2 — neighbor adjacencies
Q9.Which OSPF network statement advertises the 192.168.10.0/24 network into area 0 and enables OSPF on matching interfaces?
Explanation: The OSPF network command uses a wildcard mask, which is the inverse of the subnet mask: for a /24 network the wildcard mask is 0.0.0.255, so the correct statement is network 192.168.10.0 0.0.0.255 area 0. Option A is wrong because 255.255.255.0 is a subnet mask, not a wildcard mask. Option C is wrong because it matches only the single host 192.168.10.1 (wildcard 0.0.0.0 means an exact match). Option D is wrong because the network command does not accept CIDR notation.
Exam objective: 200-301 3.4: Configure and verify single area OSPFv2
Q10.A router's table contains 10.10.0.0/16 (static, AD 1) and 10.10.10.0/24 (OSPF, AD 110). A packet arrives for 10.10.10.99. Which route forwards it?
Explanation: Longest prefix match is the first rule in the forwarding decision: the /24 route is more specific than the /16 route, so the OSPF route wins even though its AD is worse. Option A is wrong because AD is only compared between routes of equal prefix length. Option B is wrong because overlapping routes are resolved by prefix length every time. Option D is wrong because an ICMP redirect is sent when a better next hop exists on the same subnet, not when routes overlap.
Exam objective: 200-301 3.2: Determine how a router makes a forwarding decision by default — longest prefix match
Q11.Which first hop redundancy protocol is an open standard that works on equipment from multiple vendors?
Explanation: VRRP (Virtual Router Redundancy Protocol) is the open-standard FHRP defined by the IETF, so it works across vendors. Option A is wrong because HSRP is Cisco-proprietary. Option B is wrong because GLBP is also Cisco-proprietary. Option C is wrong because PAgP is a Cisco-proprietary link-aggregation protocol, not a first hop redundancy protocol at all.
Exam objective: 200-301 3.5: Describe the purpose, functions, and concepts of first hop redundancy protocols
Q12.A host sends a DNS query to resolve www.example.com. Which protocol and port does the query use?
Explanation: DNS queries from a client use UDP port 53 — a single small request and a single small response, with the client re-asking if no answer arrives. Option B is wrong because TCP 53 is used for zone transfers between DNS servers, not for ordinary client queries. Option C is wrong because UDP 67 is the DHCP server port. Option D is wrong because TCP 80 is HTTP.
Exam objective: 200-301 4.3: Explain the role of DHCP and DNS within the network
Q13.An SNMP agent needs to send an unsolicited alert (a trap) to the management station when an interface goes down. Which UDP port does the trap use?
Explanation: SNMP traps are sent from the agent to the management station on UDP port 162. Option A is wrong because UDP 161 is the port the manager uses to query the agent. Option C is wrong because UDP 514 is syslog. Option D is wrong because UDP 123 is NTP.
Exam objective: 200-301 4.4: Explain the function of SNMP in network operations
Q14.An engineer needs an ACL entry that matches the entire 10.0.0.0/8 network as a source. Which wildcard mask is correct?
Explanation: A wildcard mask is the inverse of the subnet mask: for a /8 network the subnet mask is 255.0.0.0, so the wildcard mask is 0.255.255.255 (the first octet must match, the remaining three can be anything). Option A (0.0.0.255) matches a /24. Option B (0.0.255.255) matches a /16. Option D (255.0.0.0) is a subnet mask, not a wildcard mask.
Exam objective: 200-301 5.6: Configure and verify access control lists — wildcard masks
Q15.Which encryption standard does WPA2 use?
Explanation: WPA2 (IEEE 802.11i) uses AES encryption with CCMP (Counter Mode with Cipher Block Chaining Message Authentication Code Protocol), which is why it is far stronger than its predecessors. Option A describes WEP, which is broken. Option B describes WPA, which used TKIP as a stopgap improvement over WEP. Option C is wrong because DES is an old encryption standard not used in Wi-Fi security.
Exam objective: 200-301 5.9: Describe wireless security protocols (WPA, WPA2, and WPA3)
Q16.An engineer runs service password-encryption on a router and assumes all passwords in the configuration are now strongly protected. Why is this assumption wrong?
Explanation: service password-encryption applies Cisco's Type 7 encryption, which is weak and easily reversible with freely available tools — it stops someone reading passwords over your shoulder, not a determined attacker. Strong protection comes from enable secret and username ... secret, which use strong hashes. Option B is wrong because the command works on both routers and switches. Option C is wrong because it encrypts all plaintext passwords in the configuration, not just the enable password. Option D is wrong because it has nothing to do with RADIUS.
Exam objective: 200-301 5.3: Configure and verify device access control using local passwords
Q17.A network automation script needs to update the description of an existing VLAN through a controller's REST API. Which HTTP verb should it use?
Explanation: In the CRUD mapping, Update uses PUT (replace the resource) or PATCH (modify part of it) — exactly what changing a VLAN description requires. Option A is wrong because GET only reads data and changes nothing. Option C is wrong because POST creates a new resource rather than updating an existing one. Option D is wrong because DELETE removes a resource entirely.
Exam objective: 200-301 6.5: Describe characteristics of REST-based APIs (authentication types, CRUD, HTTP verbs, and data encoding)
Q18.Which of the following is valid JSON?
Explanation: Valid JSON requires double-quoted strings for keys and string values, and no trailing comma after the last item: {"hostname": "R1", "uptime": 42} meets both rules. Option A is wrong because of the trailing comma after 42. Option B is wrong because JSON requires double quotes, not single quotes. Option D is wrong because the keys and the string value are unquoted.
Exam objective: 200-301 6.7: Recognize components of JSON-encoded data
Q19.A team wants to define its cloud infrastructure — virtual machines, networks, and storage — in version-controlled files, and have a tool create and update that infrastructure automatically. Which tool fits this requirement?
Explanation: Terraform is an infrastructure-as-code tool: you declare the desired infrastructure in configuration files, and Terraform creates and updates the real infrastructure to match, tracking state between runs. Option A is wrong because Ansible configures devices that already exist rather than provisioning new infrastructure. Option B is wrong because a syslog server collects logs; it does not create infrastructure. Option C is wrong because SNMP monitors devices; it does not provision them.
Exam objective: 200-301 6.6: Recognize the capabilities of configuration management mechanisms such as Ansible and Terraform
Q20.A network engineer needs a device that forwards packets between two different IP subnets and stops broadcast traffic from spreading between them. Which device should be used?
Explanation: A router forwards packets between different IP networks using the destination IP address, and broadcast traffic does not cross a router, so it is the correct choice. Option A is wrong because a Layer 2 switch forwards frames within a single network and forwards broadcasts to all ports in the VLAN. Option C is wrong because an access point provides wireless connectivity; it does not route between subnets. Option D is wrong because a hub simply repeats bits to all ports — it performs no forwarding decision at all and is not used in modern networks.
Exam objective: 200-301 1.1: Role and function of network components — routers
Q21.A company is designing a data centre where servers exchange large amounts of traffic with each other, and any server must reach any other server in at most two hops. Which topology best fits this requirement?
Explanation: In a spine-leaf design every leaf switch connects to every spine switch, so traffic between any two servers travels leaf–spine–leaf: at most two hops, with predictable latency and easy bandwidth scaling — exactly what heavy server-to-server (east-west) traffic needs. Option A is wrong because two-tier is a campus design with access and core layers, not a data-centre fabric. Option C is wrong because SOHO describes a tiny single-device home/small-office network. Option D is wrong because hub-and-spoke is a WAN topology for connecting remote sites, not servers inside a data centre.
Exam objective: 200-301 1.2: Characteristics of network topology architectures — spine-leaf
Q22.A switch receives a unicast frame whose destination MAC address is not in its MAC address table. What does the switch do with the frame?
Explanation: When the destination MAC address is unknown, the switch floods the frame out of all ports except the receiving port, so the frame can still reach its destination — and the destination's reply then teaches the switch its location. Option B is wrong because dropping unknown unicast frames would prevent communication with any device the switch has not yet learned. Option C is wrong because switches do not know about default gateways; that is a host and router concept. Option D is wrong because switches do not send ARP requests to resolve unknown MAC addresses; ARP is used by hosts and routers to map IP addresses to MAC addresses.
Exam objective: 200-301 1.13: Switching concepts — frame flooding and MAC address table
Q23.A link between a switch and a server is up but extremely slow. show interfaces shows a large and growing number of late collisions on the switch port. What is the most likely cause?
Explanation: Late collisions on a link that is up but performing badly are the classic symptom of a duplex mismatch: the half-duplex side detects collisions while the full-duplex side transmits whenever it wants, so throughput collapses. Option A is wrong because an over-length cable typically causes CRC errors or a link that will not come up, not late collisions. Option B is wrong because a speed mismatch normally prevents the link from coming up at all. Option D is wrong because a full MAC table causes flooding of unknown unicast frames, not collisions.
Exam objective: 200-301 1.4: Identify interface and cable issues — mismatch duplex
Q24.A voice-over-IP application needs minimal delay and can tolerate an occasional lost packet. Which transport protocol should it use, and why?
Explanation: UDP is connectionless with no handshake, acknowledgement, or retransmission, so its latency is minimal — exactly what real-time voice needs, where a retransmitted packet would arrive too late to be useful anyway. Option B is wrong because strict ordering matters less than low delay for voice, and TCP's retransmission delays would degrade the call. Option C is wrong because UDP does not guarantee delivery at all — it is best-effort. Option D is wrong because TCP's header (20 bytes minimum) is larger than UDP's (8 bytes), not smaller.
Exam objective: 200-301 1.5: Compare TCP to UDP — UDP use cases
Q25.What is the network address of the subnet containing 192.168.5.130/26?
Explanation: A /26 mask is 255.255.255.192, so the block size is 256 - 192 = 64. The subnets start at .0, .64, .128, and .192. The address 130 falls between 128 and 192, so its network address is 192.168.5.128 (usable range .129-.190, broadcast .191). Option B (.64) is the previous subnet, which covers .64-.127 and does not contain .130. Option C is the host address itself, not a network address. Option D (.192) is the next subnet, which starts above .130.
Exam objective: 200-301 1.6: Configure and verify IPv4 addressing and subnetting — network address
Q26.An engineer is subnetting 192.168.1.0/24 with VLSM. The largest department needs 60 hosts. Which subnet should be assigned to it first?
Explanation: The largest requirement is allocated first, and it needs the smallest mask that fits 60 hosts: a /26 provides 62 usable hosts, so 192.168.1.0/26 is the correct assignment. Option A is wrong because a /27 provides only 30 usable hosts — too few for 60 hosts. Option B is wrong because a /28 provides only 14. Option C is wrong because a /25 would work but wastes 64 addresses that other departments need; VLSM is about right-sizing each subnet.
Exam objective: 200-301 1.6: Configure and verify IPv4 addressing and subnetting — VLSM
Q27.A device with MAC address 00:1a:2b:3c:4d:5e builds its IPv6 interface identifier using modified EUI-64. What is the resulting interface ID?
Explanation: Modified EUI-64 splits the MAC address in half, inserts fffe in the middle, and flips the seventh bit of the first byte. 00:1a:2b:3c:4d:5e becomes 001a:2bff:fe3c:4d5e after inserting fffe, and flipping the seventh bit changes the first byte from 00 to 02, giving 021a:2bff:fe3c:4d5e. Option A forgets the bit flip. Option C puts fffe at the end instead of the middle and does not flip the bit. Option D does neither the insertion nor the correct flip.
Exam objective: 200-301 1.9: Describe IPv6 address types — Modified EUI 64
Q28.What does the 802.1Q protocol do on a trunk link?
Explanation: 802.1Q inserts a 4-byte tag into the Ethernet frame, including a 12-bit VLAN ID, so the receiving switch knows which VLAN the frame belongs to. Option A is wrong because 802.1Q provides no encryption — the tag is plain identification. Option C describes EtherChannel, not 802.1Q. Option D describes Spanning Tree Protocol, not 802.1Q.
Exam objective: 200-301 2.2: Configure and verify interswitch connectivity — 802.1Q
Q29.In a router-on-a-stick design, a router subinterface is configured for VLAN 30 with the command encapsulation dot1Q 30. What is the purpose of this command?
Explanation: encapsulation dot1Q 30 tells the subinterface to tag outgoing frames with VLAN 30 and to accept incoming frames tagged for VLAN 30 — it is what binds the subinterface to that VLAN. Option B is wrong because VLANs are created on switches, not on routers; the router only processes tagged traffic. Option C is wrong because Spanning Tree is a switch feature and does not run on router subinterfaces. Option D is wrong because the native VLAN is a switch trunk setting; a subinterface with encapsulation dot1Q 30 (without the native keyword) handles tagged traffic for VLAN 30.
Exam objective: 200-301 2.1: Configure and verify VLANs (normal range) spanning multiple switches — interVLAN connectivity
Q30.A switch port configured with PortFast receives a BPDU. BPDU guard is enabled on the port. What happens?
Explanation: BPDU guard is designed for exactly this: a PortFast port should only ever connect to an endpoint, so receiving a BPDU means a switch was plugged in, and BPDU guard error-disables the port to protect the spanning tree topology. Option A is wrong because PortFast ports skip the learning state, and BPDU guard does not send a port to learning. Option B describes BPDU filter behaviour, not BPDU guard. Option C is wrong because receiving a BPDU does not make a port the root port; root port selection depends on path cost to the root bridge.
Exam objective: 200-301 2.5: Interpret basic operations of Rapid PVST+ Spanning Tree Protocol — BPDU guard
Q31.An EtherChannel is configured with LACP. One switch port is set to active mode and the other to passive mode. What happens?
Explanation: LACP active mode initiates negotiation and passive mode responds to it, so active-passive is a valid combination and the channel forms. Option A is wrong because the modes do not need to match — they need to be compatible, and active-passive is compatible (only passive-passive fails). Option C is wrong because LACP and PAgP are separate, incompatible protocols; enabling both does not help. Option D is wrong because no error occurs — the combination is valid.
Exam objective: 200-301 2.4: Configure and verify (Layer 2/Layer 3) EtherChannel (LACP)
Q32.What is the role of a wireless LAN controller (WLC) in a lightweight AP deployment?
Explanation: In the split-MAC architecture, the WLC centralises management — configuration, security policy, client roaming, and radio resource management — while the lightweight APs handle real-time radio functions. Option B is wrong because internet access comes from the wired network and router, not the controller. Option C is wrong because the controller manages APs; it does not replace them. Option D is wrong because IP addresses are assigned by a DHCP server, not the WLC.
Exam objective: 200-301 2.6: Describe Cisco Wireless Architectures and AP modes
Q33.A branch office has a lightweight AP managed by a central WLC, but local wireless traffic must keep working even if the WAN link to headquarters fails. Which AP mode fits this requirement?
Explanation: FlexConnect APs are managed by a central WLC but switch client traffic locally at the branch, so local wireless keeps working during a WAN outage. Option A is wrong because an autonomous AP is standalone and not managed by a WLC at all. Option B is wrong because monitor mode is for detecting rogue APs and interference, not for serving clients. Option D is wrong because rogue detector mode is a specialised monitoring role, not a client-serving mode.
Exam objective: 200-301 2.6: Describe Cisco Wireless Architectures and AP modes — FlexConnect
Q34.A router has routes to 10.0.0.0/8 via OSPF and to 10.1.1.0/24 via RIP. A packet arrives for 10.1.1.50. Which route does the router use?
Explanation: Longest prefix match is the first rule in the forwarding decision: the /24 route is more specific than the /8 route, so the router uses the RIP /24 route even though RIP's AD (120) is worse than OSPF's (110). Option A is wrong because AD is only compared between routes of the same prefix length. Option C is wrong because overlapping routes of different lengths are normal and do not cause drops. Option D is wrong because load balancing only happens between equal-cost routes to the same prefix.
Exam objective: 200-301 3.2: Determine how a router makes a forwarding decision by default — longest prefix match
Q35.A router learns the network 192.168.5.0/24 from OSPF (AD 110) and from RIP (AD 120). Which route is installed in the routing table?
Explanation: When two routes to the same destination have the same prefix length, the router installs the one with the lower administrative distance: OSPF (110) beats RIP (120), so only the OSPF route appears in the table. Option B is wrong because metric simplicity is irrelevant — AD decides between different protocols. Option C is wrong because routers do not load-balance between routes from different protocols with different ADs. Option D is wrong because AD exists precisely to resolve this choice.
Exam objective: 200-301 3.2: Determine how a router makes a forwarding decision by default — administrative distance
Q36.A router receives a packet destined for 203.0.113.44. Its routing table contains a static route to 203.0.113.0/24 (AD 1) and an OSPF route to 203.0.113.32/27 (AD 110). Which route forwards the packet?
Explanation: The destination 203.0.113.44 falls inside both prefixes, but the /27 is more specific than the /24, so longest prefix match selects the OSPF route — AD is only compared when prefix lengths are equal. Option A is wrong because AD never overrides a longer prefix match. Option C is wrong because overlapping routes are normal and the router resolves them by prefix length. Option D is wrong because static routes do not automatically beat dynamic routes; the decision follows prefix length, then AD, then metric.
Exam objective: 200-301 3.2: Determine how a router makes a forwarding decision by default — longest prefix match
Q37.An engineer wants a static route to 10.1.1.0/24 to act as a backup that is only used if the OSPF route to the same network fails. Which command achieves this?
Explanation: A floating static route needs an administrative distance higher than the protocol it backs up: OSPF's AD is 110, so an AD of 200 keeps the static route out of the table while the OSPF route exists, and it appears only when the OSPF route fails. Option B is wrong because AD 1 (the default) would beat OSPF and the static route would always be installed. Option C is wrong because without an AD value the route uses the default AD of 1. Option D is wrong because AD 90 is lower than OSPF's 110, so the static route would still win.
Exam objective: 200-301 3.3: Configure and verify IPv4 and IPv6 static routing — floating static
Q38.Two OSPF routers on the same Ethernet segment have priorities of 1 and 0. Which router can become the DR, and why?
Explanation: The DR election is won by the highest priority, and a priority of 0 explicitly disqualifies a router from becoming DR or BDR — so the priority-1 router wins. Option B is wrong because the highest priority wins, not the lowest. Option C is wrong because priorities do not need to match; only the area, subnet, timers, and authentication must agree. Option D is wrong because each segment elects one DR and one BDR, not two DRs.
Exam objective: 200-301 3.4: Configure and verify single area OSPFv2 — broadcast (DR/BDR selection)
Q39.Which first hop redundancy protocol load-balances traffic across all routers in the group, rather than using one active router and idle standbys?
Explanation: GLBP (Gateway Load Balancing Protocol) has the active virtual gateway assign different virtual MAC addresses to different hosts, so traffic is spread across all routers in the group instead of leaving standby routers idle. Option A is wrong because HSRP uses one active router and a standby. Option C is wrong because VRRP likewise uses one master router and backups. Option D is wrong because LACP is a link-aggregation protocol for bundling Ethernet links, not a first hop redundancy protocol.
Exam objective: 200-301 3.5: Describe the purpose, functions, and concepts of first hop redundancy protocols
Q40.A host with private address 192.168.1.10 accesses the internet through a NAT router, which translates it to public address 203.0.113.5. What is 192.168.1.10 called in NAT terminology?
Explanation: The inside local address is the device's private address as it appears inside the local network — 192.168.1.10. Option A is wrong because the inside global address is the public address the device is translated to (203.0.113.5). Option C is wrong because the outside global address is the public address of the internet destination. Option D is wrong because the outside local address is how the destination appears inside the network.
Exam objective: 200-301 4.1: Configure and verify inside source NAT using static and pools
Q41.A DHCP server is on a different subnet from the clients it serves. What must be configured on the router interface facing the clients so they can obtain addresses?
Explanation: DHCP Discover messages are broadcasts, which routers do not forward. ip helper-address on the client-facing interface turns the router into a DHCP relay, forwarding the broadcasts as unicast packets to the DHCP server on the other subnet. Option A is wrong because ip dhcp pool makes the router itself a DHCP server, which is not what is needed when a server already exists elsewhere. Option C is wrong because NAT translates addresses and has nothing to do with DHCP relaying. Option D is wrong because NTP synchronises clocks, not DHCP messages.
Exam objective: 200-301 4.6: Configure and verify DHCP client and relay
Q42.A network engineer configures logging trap 4 on a router. Which syslog severity levels will be sent to the syslog server?
Explanation: logging trap sets the least severe level to send, and all more severe levels are included: trap 4 sends levels 0 (Emergency), 1 (Alert), 2 (Critical), 3 (Error), and 4 (Warning). Option A is backwards — it treats higher numbers as more severe, when the scale runs the other way. Option B is wrong because the trap level is a threshold, not a single level. Option D is wrong because it only includes the two most severe levels.
Exam objective: 200-301 4.5: Describe the use of syslog features, including facilities and severity levels
Q43.An engineer creates an ACL with a single entry: access-list 10 deny 192.168.1.0 0.0.0.255. The ACL is applied inbound on an interface. What happens to traffic from 10.1.1.5 arriving at that interface?
Explanation: Every ACL ends with an implicit deny ip any any, so traffic that matches no explicit permit is dropped — an ACL containing only a deny statement blocks everything, including traffic from 10.1.1.5. Option A is wrong because it ignores the implicit deny. Option C is wrong because standard ACLs filter in whichever direction they are applied. Option D is wrong because the router does not forward ACL decisions to another device.
Exam objective: 200-301 5.6: Configure and verify access control lists — implicit deny
Q44.Which ACL entry permits HTTP traffic from the 192.168.1.0/24 network to any destination?
Explanation: HTTP is TCP port 80, so the correct extended ACL entry is access-list 100 permit tcp 192.168.1.0 0.0.0.255 any eq 80, with the wildcard mask 0.0.0.255 matching the /24 source network. Option B is a standard ACL entry, which can only match the source address — it cannot specify a protocol or port. Option C is wrong twice: HTTP uses TCP, not UDP, and 255.255.255.0 is a subnet mask, not the wildcard mask 0.0.0.255. Option D is wrong because it denies traffic to the network rather than permitting traffic from it, and it has the source and destination reversed.
Exam objective: 200-301 5.6: Configure and verify access control lists — extended ACLs
Q45.An organisation wants centralised AAA for router administration, with the entire packet encrypted and separate control over which commands each administrator can run. Which protocol fits?
Explanation: TACACS+ encrypts the entire packet (RADIUS encrypts only the password), runs over TCP port 49, and treats authentication, authorization, and accounting as separate functions, which allows per-command authorization — exactly what device administration needs. Option A is wrong because RADIUS encrypts only the password and combines authentication with authorization. Option C is wrong because SNMPv3 is a network management protocol, not an AAA protocol for administrator access. Option D is wrong because Kerberos is not one of the AAA protocols in the CCNA blueprint.
Exam objective: 200-301 5.8: Compare authentication, authorization, and accounting concepts — TACACS+ vs RADIUS
Q46.An attacker connects a rogue DHCP server to a client-facing switch port. Which feature prevents clients from receiving the attacker's DHCP offers?
Explanation: DHCP snooping classifies client-facing ports as untrusted and drops DHCP Offer and Acknowledgement messages arriving on them, so a rogue server's offers never reach clients. Option A is wrong because port security limits MAC addresses, not DHCP messages — the rogue server's own MAC address may be perfectly legitimate. Option B is wrong because DAI validates ARP packets, not DHCP traffic. Option C is wrong because BPDU guard deals with spanning tree messages, not DHCP.
Exam objective: 200-301 5.7: Configure and verify Layer 2 security features (DHCP snooping, dynamic ARP inspection, and port security) — DHCP snooping
Q47.Which wireless security protocol is considered broken and should never be used?
Explanation: WEP uses RC4 encryption with short static keys and has fundamental cryptographic flaws that allow its keys to be recovered in minutes — it provides no real security and should never be deployed. Option A is wrong because WPA3 is the current, strongest standard. Option B is wrong because WPA2 with AES remains a sound baseline. Option D is wrong because WPA, while superseded by WPA2, is not broken in the way WEP is.
Exam objective: 200-301 5.9: Describe wireless security protocols (WPA, WPA2, and WPA3)
Q48.In a controller-based (SDN) architecture, what is the difference between the control plane and the data plane?
Explanation: The control plane is the decision-making intelligence (which path should traffic take?), centralised in the controller in an SDN design; the data plane is the actual forwarding of packets, which happens on the network devices following the controller's instructions. Option B reverses the two. Option C is wrong because both planes are logical functions, not physical media. Option D is wrong because the separation of control and data planes is the defining idea of SDN.
Exam objective: 200-301 6.3: Describe controller-based, software defined architecture — separation of control plane and data plane
Q49.Which HTTP verb is used to retrieve information from a REST API, and which is used to create a new resource?
Explanation: In the CRUD mapping for REST APIs, Read uses GET and Create uses POST (Update uses PUT or PATCH, Delete uses DELETE). Option B swaps the two verbs. Option C is wrong because PUT updates and DELETE removes; neither retrieves or creates. Option D is wrong for the same reason.
Exam objective: 200-301 6.5: Describe characteristics of REST-based APIs (authentication types, CRUD, HTTP verbs, and data encoding)
Q50.Which command configures a default static route through the next-hop router at 192.168.1.2?
Explanation: A default route uses 0.0.0.0 for both the destination network and the mask, followed by the next-hop address: ip route 0.0.0.0 0.0.0.0 192.168.1.2. Option A is wrong because it points at a specific network (192.168.1.0) rather than the default, and puts 0.0.0.0 in the next-hop position. Option B is wrong because the mask 255.255.255.255 would make it a host route to 0.0.0.0, not a default route. Option C uses an exit interface instead of the required next-hop address.
Exam objective: 200-301 3.3: Configure and verify IPv4 and IPv6 static routing — default route