AWS SAA vs Azure AZ-104: Which Cloud Certification First?

By Abu Anns · Last updated 20 November 2026

AWS SAA (Solutions Architect – Associate, exam SAA-C03) and Azure AZ-104 (Microsoft Certified: Azure Administrator Associate) are the two most popular associate-level cloud certifications — but they are not quite the same kind of credential. The SAA is an architect exam: it tests whether you can design systems on AWS. The AZ-104 is an administrator exam: it tests whether you can run and manage systems on Azure day to day. Comparing them is still useful, because most people starting a cloud career pick one cloud first, and the choice shapes the jobs you can apply for. The honest answer is that the right first cert depends on which cloud your target employers use — and on whether you want to design systems or operate them.

AWS SAA vs Azure AZ-104 at a glance

AWS SAA-C03Azure AZ-104
Issued byAmazon Web ServicesMicrosoft
RoleSolutions architect (design)Administrator (operations)
Experience requiredNone formally required; AWS recommends about 1 year of hands-on experience designing systems on AWSNone formally required; Microsoft recommends about 6 months of hands-on Azure administration
Exam fee$150 USD$165 USD
Questions65 (50 scored, 15 unscored)40–60 (Microsoft does not publish an exact count)
Duration130 minutes100 minutes (120 minutes when lab tasks are included)
Pass mark720 on a 100–1,000 scaled score700 on a 100–1,000 scaled score
Question styleScenario-based multiple choice and multiple response; no hands-on labsMultiple choice, case studies, drag-and-drop, and sometimes graded lab tasks in a live Azure environment
Validity / renewal3 years; renew by passing the recertification exam or a higher-level AWS exam1 year; renew free with an online assessment on Microsoft Learn
DifficultyModerate — broad, with heavy emphasis on choosing between similar servicesModerate — narrower, but lab tasks and case studies punish candidates without hands-on practice

AZ-104 facts per Microsoft Learn and Microsoft's exam page, current for the skills outline updated 17 April 2026. SAA facts per AWS's exam guide for SAA-C03. Prices are US list prices; local pricing and taxes vary.

Two different jobs, two different exams

The SAA asks you to design. A typical question describes a company's requirements — "a workload that must survive an Availability Zone failure, stay under a budget, and serve users globally" — and asks which architecture meets them. You need to know what each AWS service does, but more importantly you need to know which one fits a given situation: when to use S3 versus EBS, when a load balancer is the answer, when serverless beats servers. The exam covers four domains — secure architectures (30%), resilient architectures (26%), high-performing architectures (24%), and cost-optimized architectures (20%) — and almost every question is a trade-off between two or more plausible designs.

The AZ-104 asks you to operate. Its five domains cover managing Azure identities and governance, implementing and managing storage, deploying and managing Azure compute resources, implementing and managing virtual networking, and monitoring and maintaining Azure resources. The questions are more procedural: which steps, in which order, using which tool? And unlike the SAA, AZ-104 sittings can include graded lab tasks where you perform real actions in a live Azure environment — Microsoft does not say in advance whether your sitting will include them. That makes hands-on practice non-negotiable for AZ-104 in a way it is not for the SAA.

Cost and time commitment

The exams themselves are close in price: $150 for the SAA, $165 for the AZ-104. Retakes cost the full fee each time (AWS requires a 14-day wait after a failed attempt; Microsoft's retake policy allows a retake after 24 hours for a first failure, with longer waits after further failures). Where the two differ is renewal. The SAA lasts three years, and renewal means passing an exam — either the SAA recertification or a higher-level AWS exam. The AZ-104 lasts only one year, but renewal is free: a short online assessment on Microsoft Learn, which you can take in the six months before expiry. Over a three-year horizon, the AZ-104 is cheaper to hold — but only if you remember to renew every year.

Study time is similar for both: most candidates need 6–12 weeks of focused preparation, assuming some prior cloud exposure. Complete beginners should budget longer, and should seriously consider starting with a fundamentals cert (AWS Cloud Practitioner or Azure AZ-900) before either of these — both are cheaper, shorter exams that teach the vocabulary the associate exams assume you already know.

Which cloud should you bet on?

This is the question that actually decides it, and the answer is local. AWS holds roughly a third of the global cloud market — the largest share — and the SAA is the most requested AWS certification in job postings. If you are job-hunting broadly, or targeting startups, tech companies, and remote roles, AWS is the safer first bet. Azure is strongest in enterprises that already run on Microsoft: large corporates, government, and organisations with heavy Windows, Active Directory, and Microsoft 365 estates. If the employers in your city or your industry run on Microsoft, AZ-104 may open more doors than the SAA despite AWS's larger global share.

The practical move is to check before you commit: search job boards for the roles you want, in the places you want to work, and count how many ask for AWS versus Azure. Ten minutes of job-board research is worth more than any global market-share statistic. And remember that the first cloud cert is the hardest — the second one, on the other cloud, typically takes half the study time, because the concepts (compute, storage, networking, identity, monitoring) are the same and only the service names change.

Which is harder?

Both are moderate-difficulty associate exams, and most candidates who fail either one fail for the same reason: too much reading, not enough doing. The SAA is broader — 65 questions across the whole AWS platform — and its hardest questions ask you to choose between services that overlap (S3 vs EBS vs EFS, or ALB vs NLB vs CloudFront), where the correct answer turns on one or two words in the scenario. The AZ-104 is narrower but more hands-on: the lab tasks and case studies are unforgiving if you have only read about Azure without clicking through the portal. Neither exam publishes a pass rate, so ignore any percentage you see quoted online. Plan on 8–12 weeks of study with real hands-on labs either way — the AWS Free Tier and the Azure free account both let you practise the core services at no cost.

The verdict

Choose the AWS SAA first if you want the broadest job market, you are drawn to architecture and system design, or your target employers run on AWS. Choose Azure AZ-104 first if your target employers run on Microsoft, you want an operations or administration role, or you already work in a Windows/Active Directory environment. Choose based on the job market, not the exam: the two exams are close in cost, difficulty, and study time, so the deciding factor should be which cloud appears in the job postings you actually want. Either way, the second cloud cert is much easier than the first — and holding one of each is a strong combination. If AWS is your pick, our free AWS SAA study guides, mock test, and 4-week study plan cover the whole SAA-C03 exam. If you are still deciding between fields, our which certification first guide compares cloud, security, and project management as career paths.

Advertisement